Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Manheim Township
Superpave Asphalt Mixture Design, 9.5 mm, PG 64S-22, Scratch or Leveling Course, 0.3 to 3.0 million ESAL's, placed on public roadways as directed. 1,888 tons Superpave Asphalt Mixture Design, 9.5 mm, PG64S-22, Wearing Course, 0.3 to 3.0 million ESAL's, SRL as bid, placed on public roadways as directed. SRL H 1,123 tons SRL M 9,577 tons Mill asphalt roadway surface starting on the edge of the roadway at 1-1/2 inch depth and ending 12 feet away at a 0 inch depth including cleanup and hauling of milled material
Posted Date
May 19, 2026
Due Date
Jun 16, 2026
Release: May 19, 2026
Manheim Township
Close: Jun 16, 2026
Superpave Asphalt Mixture Design, 9.5 mm, PG 64S-22, Scratch or Leveling Course, 0.3 to 3.0 million ESAL's, placed on public roadways as directed. 1,888 tons Superpave Asphalt Mixture Design, 9.5 mm, PG64S-22, Wearing Course, 0.3 to 3.0 million ESAL's, SRL as bid, placed on public roadways as directed. SRL H 1,123 tons SRL M 9,577 tons Mill asphalt roadway surface starting on the edge of the roadway at 1-1/2 inch depth and ending 12 feet away at a 0 inch depth including cleanup and hauling of milled material
AvailableManheim Township
Provide snow removal equipment rental.
Posted Date
May 14, 2026
Due Date
May 28, 2026
Release: May 14, 2026
Manheim Township
Close: May 28, 2026
Provide snow removal equipment rental.
AvailableManheim Township
Replacement of a bridge located on trail. Including 67 CY Class 3 excavation; 2 CY no. 57 coarse aggregate; 49 CY structural backfill; 12 CY class A cement concrete; 4,681 lb fabricated structural steel; 810 lb reinforcement bars; 60 LF pedestrian railing; 1 LF pressure treated wood decking.
Posted Date
May 5, 2026
Due Date
Jun 3, 2026
Release: May 5, 2026
Manheim Township
Close: Jun 3, 2026
Replacement of a bridge located on trail. Including 67 CY Class 3 excavation; 2 CY no. 57 coarse aggregate; 49 CY structural backfill; 12 CY class A cement concrete; 4,681 lb fabricated structural steel; 810 lb reinforcement bars; 60 LF pedestrian railing; 1 LF pressure treated wood decking.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable here—deprioritize and ask about using an authorized cooperative instead.
Coops: Ask if they can leverage DGS/COSTARS or County of Lancaster; also consider CPS (IU13), OMNIA Partners, or PEPPM if they’re open to coops. If coops aren’t viable, expect a formal competitive bid as the default (threshold ~$23,800).
Manheim Township shows a near-total avoidance of sole source awards and a clear preference for open competition. Deprioritize this path and pivot immediately to validating the Township’s willingness to use its authorized cooperative purchasing agreements as the primary alternative to a formal bid process.
Board meetings and strategic plans from Manheim Township
This document presents Manheim Township's specific staffing plan for its fire-based Emergency Medical Services. It outlines the proposed acquisition and financing of four EMS transport units and three Advanced Life Support (ALS) chase trucks, their strategic placement, and the detailed staffing requirements including paramedics, AEMTs, and EMTs. The plan further includes comprehensive salary and benefits projections, alongside an analysis of the advantages and disadvantages of transitioning to an in-house EMS staff.
The Manheim Township Comprehensive Plan is focused on shaping the future of the Township by addressing key issues such as fiscal sustainability, housing affordability, transportation, and land use regulations. It aims to achieve long-term fiscal stability, align local institutions with community needs, and ensure residents have the necessary resources and infrastructure for a high quality of life. The plan emphasizes strategic investments, responsible growth, and collaboration to address challenges and enhance the community.
The annual organizational meeting included a roll call and welcoming of the new board member. The board elected a chairperson and vice chairperson. The 2019 Board of Appeals Directory was updated. The Manheim Township UCC Application for Appeal form was reviewed. The 2019 UCC BOA meeting and hearing dates were reviewed. The board discussed Manheim Township's pending building code Ordinance and examples of granted code modifications from 2018.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Manheim Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Director of Public Works - Field Operations
Premium
Access the largest public sector contact database
© 2026 Starbridge