Joint Outfall F Unit 3A Trunk Sewer Rehabilitation RFP
Posted
Oct 14, 2026
Dec 8, 2026
Work includes approx 14,238 LF of 60" RCP sewer by sliplining with 54" nomnal fiberglass reinforced plastic (FRP) liner pipe; rehabilitate approximately twenty-eight (28) manholes with a protective coating system, and rehabilitate three (3) structures with a protective coating system. This project will also rehabilitate approximately one (1) structure for the Joint Outfall A Unit 8 Trunk Sewer with a protective liner system and all appurtenant work.

