Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lord Fairfax Soil And Water Conservation District
Work include water line relocation consists of the construction of approx 4,700 LF of 12" hdpe raw water line, including associated fittings, bends, valves, air release valves, tie-ins to existing facilities, testing, and restoration..
Posted Date
Jul 17, 2026
Due Date
Aug 20, 2026
Release: Jul 17, 2026
Lord Fairfax Soil And Water Conservation District
Close: Aug 20, 2026
Work include water line relocation consists of the construction of approx 4,700 LF of 12" hdpe raw water line, including associated fittings, bends, valves, air release valves, tie-ins to existing facilities, testing, and restoration..
AvailableLord Fairfax Soil And Water Conservation District
The quarry intake pump station enclosure consists of dismantling and removing an existing preengineered canopy structure from the quarry pump station and replacing it with a pre-engineered metal building. The pre-engineered metal building includes mechanical ventilation improvements and re-installation of existing electrical appurtenances and lighting.
Posted Date
Mar 16, 2026
Due Date
Apr 16, 2026
Release: Mar 16, 2026
Lord Fairfax Soil And Water Conservation District
Close: Apr 16, 2026
The quarry intake pump station enclosure consists of dismantling and removing an existing preengineered canopy structure from the quarry pump station and replacing it with a pre-engineered metal building. The pre-engineered metal building includes mechanical ventilation improvements and re-installation of existing electrical appurtenances and lighting.
Lord Fairfax Soil And Water Conservation District
Project includes phase 2 raw water line extension consists of approx 1,900 LF of 20" raw water line including a jack and bore crossing of a road and railroad with approx 137 LF of raw water line installed in steel casing. Project includes modifications to interconnections at a pump station and water treatment plant site on each end of the raw water line.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Lord Fairfax Soil And Water Conservation District
Close: Dec 18, 2025
Project includes phase 2 raw water line extension consists of approx 1,900 LF of 20" raw water line including a jack and bore crossing of a road and railroad with approx 137 LF of raw water line installed in steel casing. Project includes modifications to interconnections at a pump station and water treatment plant site on each end of the raw water line.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lord Fairfax Soil And Water Conservation District
The board discussed filling director seats, reviewed grant deliverables, and approved the proposed PY26 budget and staff salary adjustments. Technical reports covered project completions, outreach events, and dam safety updates including emergency action plans and equipment upgrades. Numerous conservation projects were reviewed, resulting in approvals for various cost-share agreements, tax credits, and contract increases. Additionally, the board approved the annual plan of work, an updated strategic plan, and received updates from cooperating agencies regarding well water testing, livestock projects, and legislative budget statuses.
This strategic plan for The Lord Fairfax Soil and Water Conservation District aims to achieve productive soil and water for the benefit and enjoyment of the people by conserving, protecting, and enhancing the quality of the region's soil and water. The plan focuses on four key goals: strengthening the District's organizational efficiency and capacity to address conservation needs, maintaining and enhancing its advocacy plan, and increasing and stabilizing its funding.
This document outlines the process for reviewing and revising the organization's four-year Strategic Plan, which sets organizational goals. It emphasizes community engagement through specialized online surveys for stakeholders in Education, Agriculture, Urban, and Public/Partners sectors to accurately assess community needs and gather valuable feedback for the update process.
The board discussed several operational and financial reports, including the Chair's report on insurance costs and funding uncertainty, and a review of April bank statements and financial documents. The agenda covered committee reports from the Conservation Technical, Dam Safety, Education and Information, Legislative, Personnel, and Operations committees. Key actions included the approval of tax credits, cost share increases, and the resignation of a county director. Additionally, updates were provided by cooperating agencies such as the Natural Resources Conservation Service, the Department of Conservation and Recreation, and the Virginia Department of Environmental Quality, regarding water quality studies and upcoming staff training requirements.
The board meeting included staff reports from various conservation specialists regarding site visits, conservation projects, and upcoming events. The Conservation Technical Committee presented reports and motions regarding audit procedures and file review checklists. Additional agenda items included an update on the Woodstock Dam emergency action plan, the delegation of authority to the Education and Information Committee for scholarship selections, and discussions regarding annual staff reviews, legislative association dues, and internal strategic planning. Reports were also provided by cooperating agencies including the Natural Resources Conservation Service and the Virginia Department of Conservation and Recreation.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lord Fairfax Soil And Water Conservation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Administrative Manager; Records Retention & FOIA Officer
Premium
Access the largest public sector contact database
© 2026 Starbridge