Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
University or college mascot.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lone Star College University Park
Lone Star College System issued a Formal Request for Quote (FRFQ# 26-02-06) to replace and install four speakers and an amplifier in the Piano Lab at University Park to improve audio clarity. The contractor is responsible for removing existing QSC equipment, providing equivalent replacements, and ensuring proper integration with the existing Korg GEC5 Teacher unit. Bidders must be part of the college's board-approved A/V vendor pool and submit all quotes electronically through the official eBid system.
Posted Date
Feb 23, 2026
Due Date
Mar 26, 2026
Release: Feb 23, 2026
Lone Star College University Park
Close: Mar 26, 2026
Lone Star College System issued a Formal Request for Quote (FRFQ# 26-02-06) to replace and install four speakers and an amplifier in the Piano Lab at University Park to improve audio clarity. The contractor is responsible for removing existing QSC equipment, providing equivalent replacements, and ensuring proper integration with the existing Korg GEC5 Teacher unit. Bidders must be part of the college's board-approved A/V vendor pool and submit all quotes electronically through the official eBid system.
AvailableLone Star College University Park
Work includes renovation of the outdoor patio deck. Roof replacement and related renovation work of the existing facility. Work includes, but is not limited to, the following: remove, store, and reinstall tables, chairs, and other site furnishings; remove and properly dispose of existing decking on designated outdoor patio; repair existing wood framing as necessary; remove, store/retain, and reinstall existing cable hand-rail system; salvage and protect existing hand-rails; install new composite decking; provide specified manufacturer and contractor warranties.
Posted Date
Aug 11, 2025
Due Date
Aug 25, 2025
Release: Aug 11, 2025
Lone Star College University Park
Close: Aug 25, 2025
Work includes renovation of the outdoor patio deck. Roof replacement and related renovation work of the existing facility. Work includes, but is not limited to, the following: remove, store, and reinstall tables, chairs, and other site furnishings; remove and properly dispose of existing decking on designated outdoor patio; repair existing wood framing as necessary; remove, store/retain, and reinstall existing cable hand-rail system; salvage and protect existing hand-rails; install new composite decking; provide specified manufacturer and contractor warranties.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Lone Star College University Park's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
President, Lone Star College-University Park
Premium
Access the largest public sector contact database