Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Little Blue Valley Sewer District
The Little Blue Valley Sewer District requests bids to rehabilitate the South NPW Pump Station at the Atherton Wastewater Treatment Plant, including replacing and/or installing pumps, drives, and related equipment. The solicitation is an Invitation to Bid (ITB-10-2446-0426-0-2026/tlp) posted on April 30, 2026, and closes on June 2, 2026, at 2:00 PM Central. Bid documents and drawings are distributed via DemandStar, as no buyer-hosted posting was located on the district's public bids page.
Posted Date
Apr 30, 2026
Due Date
Jun 2, 2026
Release: Apr 30, 2026
Little Blue Valley Sewer District
Close: Jun 2, 2026
The Little Blue Valley Sewer District requests bids to rehabilitate the South NPW Pump Station at the Atherton Wastewater Treatment Plant, including replacing and/or installing pumps, drives, and related equipment. The solicitation is an Invitation to Bid (ITB-10-2446-0426-0-2026/tlp) posted on April 30, 2026, and closes on June 2, 2026, at 2:00 PM Central. Bid documents and drawings are distributed via DemandStar, as no buyer-hosted posting was located on the district's public bids page.
AvailableLittle Blue Valley Sewer District
Project scope includes, but is not limited to the following: • Installation of one new aeration blower and appurtenances. • Installation of new blower VFD, local control panel, and upgrades to the blower electrical systems (e.g. switchgear, wiring, conduit). • Space allocations and electrical supply plans for a future second high speed turbo blower of the same size and configuration as the new blower provided under this project. • Interior blower room modifications to provide dedicated interior space as needed for new and future electrical / HVAC equipment. • Modifications of blower intake and discharge piping to accommodate new blower. • And other related improvements.
Posted Date
Apr 23, 2026
Due Date
May 26, 2026
Release: Apr 23, 2026
Little Blue Valley Sewer District
Close: May 26, 2026
Project scope includes, but is not limited to the following: • Installation of one new aeration blower and appurtenances. • Installation of new blower VFD, local control panel, and upgrades to the blower electrical systems (e.g. switchgear, wiring, conduit). • Space allocations and electrical supply plans for a future second high speed turbo blower of the same size and configuration as the new blower provided under this project. • Interior blower room modifications to provide dedicated interior space as needed for new and future electrical / HVAC equipment. • Modifications of blower intake and discharge piping to accommodate new blower. • And other related improvements.
AvailableLittle Blue Valley Sewer District
Provide repairs related to the raw wastewater pump station including: replacement of interior cast iron and steel sanitary sewer pipes with new solid core PVC piping and appurtenances; replacement of the incoming potable water service; installation of a potable water yard valves; and extension of two foul air pipes at the wastewater treatment plant.
Posted Date
Mar 19, 2026
Due Date
Apr 21, 2026
Release: Mar 19, 2026
Little Blue Valley Sewer District
Close: Apr 21, 2026
Provide repairs related to the raw wastewater pump station including: replacement of interior cast iron and steel sanitary sewer pipes with new solid core PVC piping and appurtenances; replacement of the incoming potable water service; installation of a potable water yard valves; and extension of two foul air pipes at the wastewater treatment plant.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Little Blue Valley Sewer District
The board meeting included a presentation on manager training for performance management and discussions regarding a natural gas purchase agreement. Updates were provided on the Atherton plant facility plan and the Middle Big Creek Phase II projects, including a change order request related to prevailing wage rates. The board also reviewed district reports on operations, compliance, and finances, and authorized the execution of a procurement agreement for aeration blowers and the issuance of a sewerage system revenue bond for the Middle Big Creek project.
The meeting agenda included confirmation of quorum, review of district reports such as Executive Director, Operations/Compliance, and Financial reports, and a presentation of the Draft Budget for 2016-2017. Key items for consideration involved several resolutions under the Consent Agenda, including the award of a bid for a replacement forklift, approval for replacing the telephone system with a hosted cloud system, authorizing a financial feasibility study for Phase III Improvements Program revenue bonds, authorizing the issuance of revenue bonds for the Little Blue Valley Sewer System improvements (including advanced air emissions controls), authorizing reimbursement for technical services related to Middle Big Creek Sewer Subdistrict easement extensions, authorizing payment for crop loss damages due to Middle Big Creek Phase I delays, and recommending the continuation of the negotiated settlement with KAT Excavation, Inc. The agenda also provided for a Counsel Report and updates on the Middle Big Creek Project, followed by New Business, Unfinished Business, and sessions for closed and open discussion.
The agenda for the meeting included confirmation of quorum, District Reports (Director's, Operations/Compliance, and Financial), and a Counsel Report. Key items under the Consent Agenda involved executing a procurement agreement with Kawasaki Heavy Industries for an aeration blower package and authorizing the issuance of a Sewerage System Revenue Bond, Series 2026, up to $6,493,000 for the Middle Big Creek Subdistrict Project. The meeting schedule also indicated an adjournment to closed session to discuss legal, union, personnel, and real estate issues.
The key discussions and actions for this meeting included receiving the Director's Report covering updates on the Middle Big Creek Phase II projects (interceptor progress, wastewater treatment plant bidding delays due to tariffs, and easement acquisition for the flow meter project), and the facility planning kickoff meeting. The Operations/Compliance Report detailed recent water quality metrics and operational issues, specifically a leak in an aeration basin air delivery line at the Atherton plant. The Financial Report provided budget status for LBVSD and MBC funds. The agenda also included the annual election of officers for the upcoming term. Consent Agenda items focused on awarding bids and approving amendments for major capital projects, specifically the Raw Pump 1 and 2 Rehabilitation Project and the Middle Big Creek Phase 2 Wastewater Treatment Facility Improvements. Further items involved recognizing two employees, John Flathers and Andy Jeffries, for 40 years of service, and authorizing the deposit of funds from the Middle Big Creek Phase II bridge loan repayment into the Rehabilitation and Replacement Fund. The Board also planned to adjourn to a closed session to discuss legal, union, personnel, and real estate matters.
The meeting agenda included confirmation of quorum, review of district reports from the Director and Operations/Compliance, and a Counsel Report. The Consent Agenda involved several significant financial actions: awarding a construction bid to Crossland Heavy Contractors for the North Non-Potable Water Pump Station Rehabilitation for approximately $1.83 million, approving an amendment to the consulting agreement with HDR Engineering, Inc. for construction phase engineering services on the same project, accepting quotes for enclosing a storage building and purchasing an air conditioner condenser unit, approving proprietary material purchases from Schwing Bisset, and accepting a quote from Trojan Technologies for UV disinfection system parts. Additionally, resolutions covered the repair of a pump at the Raintree Pump Station and the award of a major construction bid for the Big Creek Interceptor Extension Phase 2 to VF Anderson Builders, LLC for approximately $14.05 million, along with approving an amendment to the Phase II Interceptor Project agreement with Burns & McDonnell. The agenda also outlined discussions planned for the Debate Agenda and an adjournment to a Closed Session to discuss legal, union, personnel, and real estate matters.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Little Blue Valley Sewer District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Mayor of Raytown; Secretary, LBVSD Board of Trustees
Premium
Access the largest public sector contact database
© 2026 Starbridge