Demolition of The Stonerstown School Building RFP
Aug 18, 2026
Closes
Sep 4, 2026
The removal and legal disposal of the material and debris from the demolition of the 2-story brick school building with shingle roofing. The 1st floor, 4239 sq. ft. 60.3' x 70.3' and the 2nd floor 60' x 35' 4239 sq.ft. and a basement 60' x 35' 2100 sq. ft. Abatement of asbestos has been completed.