Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Leola School District 44-2
Leola School District posted a sealed-proposal solicitation titled "HVAC RFP" requesting turnkey replacement of the cafetorium HVAC system. The scope includes removal of existing rooftop units and electric heating, reuse of the existing boiler for heating, new hot-water coils, ductwork, controls integration, electrical work, roofing repairs, structural supports, crane services, commissioning and training; proposers must provide pricing for two options (flat-roof and ground-mounted) and include equipment, schedule, and warranty information. Sealed proposals are due June 29, 2026 at 12:00 p.m. local time (delivered to the Business Office or by mail) and the project must be substantially complete by August 17, 2026; no separate PDF or bid package file is attached to the posting.
Posted Date
Jun 15, 2026
Due Date
Jun 29, 2026
Release: Jun 15, 2026
Leola School District 44-2
Close: Jun 29, 2026
Leola School District posted a sealed-proposal solicitation titled "HVAC RFP" requesting turnkey replacement of the cafetorium HVAC system. The scope includes removal of existing rooftop units and electric heating, reuse of the existing boiler for heating, new hot-water coils, ductwork, controls integration, electrical work, roofing repairs, structural supports, crane services, commissioning and training; proposers must provide pricing for two options (flat-roof and ground-mounted) and include equipment, schedule, and warranty information. Sealed proposals are due June 29, 2026 at 12:00 p.m. local time (delivered to the Business Office or by mail) and the project must be substantially complete by August 17, 2026; no separate PDF or bid package file is attached to the posting.
AvailableLeola School District 44-2
Purchase and installation of the following: 1.5 million BTU viessmann high-efficiency boiler; all venting and vent fittings; 4" black pipe, 4-inch 90s, and couplings; all associated labor, materials, permits, and startup.
Posted Date
May 1, 2025
Due Date
May 5, 2025
Release: May 1, 2025
Leola School District 44-2
Close: May 5, 2025
Purchase and installation of the following: 1.5 million BTU viessmann high-efficiency boiler; all venting and vent fittings; 4" black pipe, 4-inch 90s, and couplings; all associated labor, materials, permits, and startup.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Leola School District 44-2
The board discussed several operational and administrative items, including a review of good news, financial reports, and the preliminary 2026-2027 budget. Key actions included approving a concrete project for the daycare, passing a CAG resolution regarding road maintenance responsibilities, increasing bus route pay, and approving recommendations for SDHSAA ballots. The board also reviewed quotes for a handicap-accessible door and held an executive session to address personnel matters, including the acceptance of staff resignations and the authorization to advertise for various open positions.
The joint board meeting focused on potential sports co-ops for the 2026-27 school year, including the approval of a cross country co-op and tabling decisions regarding track and field and golf. The board reviewed activity schedules and discussed future updates to the student activity handbook and co-op agreements. Additionally, the boards reconciled payments between districts and approved the advertising of junior high basketball coaching positions following executive sessions held to discuss personnel matters.
The board discussed and took action on several items including the adoption of an agenda, review of the board bills report, and financial statements. Key actions included the surplus of desktops, approval of the ASBSD Workers' Compensation Fund, and updates to daycare rates. Discussions also covered infrastructure needs like parking, play areas, and maintenance for the football field facility and cafetorium curtain. The board approved various memberships, including SDHSAA and NCSEC, closed negotiations, accepted returned contracts, and authorized fundraising hours for students. Additionally, the board approved a Cross Country coop agreement and revisions to the student handbook to include virtual world language course offerings.
The agenda focuses on administrative and operational topics, including school-wide Wi-Fi updates and E-Rate funding. Key items include a budget supplement review, maintenance and transportation updates, and discussions regarding the district calendar, facility rental alcohol requests, mileage compensation for sub-varsity officials, and the approval of volunteer staff. The meeting also includes an executive session for personnel matters under SDCL 1-25-2.
The board meeting agenda included several topics: celebrating recent student achievements in music and FFA, reviewing finance reports, and discussing the Conservation District Greenhouse Grant. Administrative reports addressed mileage reimbursement, building maintenance, and transportation needs regarding vehicle selection. The board also reviewed proposed policy changes, addressed veteran and guest meal policies, and considered personnel resignations, with an executive session scheduled to discuss specific employee matters.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Leola School District 44-2's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
K-12 Counselor / Testing Coordinator (also referenced as Counselor, PBIS Coordinator on the Staff Directory)
Premium
Access the largest public sector contact database
© 2026 Starbridge