LVMPD HQ Plumbing Drain Relining
Aug 11, 2026
Closes
Sep 9, 2026
This project involves relining the existing drain and sanitary piping systems in (2) four story buildings and (1) five-story buildings. The contractor will inspect, clean, and rehabilitate vertical stacks, horizontal runs, branch lines, and underground drains using trenchless cured-in-place pipe methods. Work to include camera inspections, with video documentation, mechanical cleaning, liner installation, branch reinstatement, and post-work verification.
