Discover Opportunities months before the RFP drops
Learn more →The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
AvailableWork includes providing bonds and insurance; remove discharge head, column assembly, pump, motor, and accessories; sound lap; haul the column assembly, pump, motor and accessories to the yard and dispose of any items not specified for reuse; run water in the well overnight; provide 680-feet (680') of 1/4-inch (1/4") dekeron-coated stainless steel airline, including strapping material, airline fittings, and airline gauge; install pump, motor, column assembly, and accessories, including assembling components; disinfect the well in accordance with awwa c-654; provide performance test, including vibration analysis.
Posted Date
Sep 12, 2025
Due Date
Oct 1, 2025
Release: Sep 12, 2025
Close: Oct 1, 2025
Work includes providing bonds and insurance; remove discharge head, column assembly, pump, motor, and accessories; sound lap; haul the column assembly, pump, motor and accessories to the yard and dispose of any items not specified for reuse; run water in the well overnight; provide 680-feet (680') of 1/4-inch (1/4") dekeron-coated stainless steel airline, including strapping material, airline fittings, and airline gauge; install pump, motor, column assembly, and accessories, including assembling components; disinfect the well in accordance with awwa c-654; provide performance test, including vibration analysis.
The work consists of cleaning and televising approx 148,322 LF of sanitary sewer pipe including 119,894 LF of 8" pipe, 11,557 LF of 10" pipe, 4,271 LF of 12" pipe, 4,444 LF of 15" pipe, 2,540 LF of 18" pipe, 4,070 LF of 21" pipe, 1,273 LF of 24" pipe, and 273 LF of 36" pipe. The work also includes television inspection of approximately 720 sanitary sewer manholes.
Posted Date
Oct 17, 2024
Due Date
Nov 5, 2024
Release: Oct 17, 2024
Close: Nov 5, 2024
The work consists of cleaning and televising approx 148,322 LF of sanitary sewer pipe including 119,894 LF of 8" pipe, 11,557 LF of 10" pipe, 4,271 LF of 12" pipe, 4,444 LF of 15" pipe, 2,540 LF of 18" pipe, 4,070 LF of 21" pipe, 1,273 LF of 24" pipe, and 273 LF of 36" pipe. The work also includes television inspection of approximately 720 sanitary sewer manholes.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis