Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lancaster Area Sewer Authority
Interceptor rehabilitation including but not limited to: pipe rehabilitation, CCTV inspection, sewer cleaning, CIPP lining, manhole/structure rehabilitation lining, and all general requirements, appurtenances and incidental items of work.
Posted Date
Jul 24, 2026
Due Date
Sep 10, 2026
Release: Jul 24, 2026
Lancaster Area Sewer Authority
Close: Sep 10, 2026
Interceptor rehabilitation including but not limited to: pipe rehabilitation, CCTV inspection, sewer cleaning, CIPP lining, manhole/structure rehabilitation lining, and all general requirements, appurtenances and incidental items of work.
AvailableLancaster Area Sewer Authority
demolition; bypass pumping; electrical service and distribution and switchgear replacement and associated earthwork, utilities, and cast-in-place concrete; electro-magnetic flowmeter and associated pipe, fittings, and painting; and all other work. The work includes all requirements to provide a fully finished and operable switchgear and electro-magnetic flowmeter for a fully functional pump station as indicated, shown, specified or required to complete the work in strict conformity with the Contract Documents. The work also includes all specified, indicated and shown electrical equipment, appliances, appurtenances, furnishings, electro-magnetic flowmeter, instrumentation and controls, accessories, tests and sundry parts and material as shall be necessary and required for a completely operable installation satisfactory to the Engineer.
Posted Date
Apr 28, 2026
Due Date
Jun 4, 2026
Release: Apr 28, 2026
Lancaster Area Sewer Authority
Close: Jun 4, 2026
demolition; bypass pumping; electrical service and distribution and switchgear replacement and associated earthwork, utilities, and cast-in-place concrete; electro-magnetic flowmeter and associated pipe, fittings, and painting; and all other work. The work includes all requirements to provide a fully finished and operable switchgear and electro-magnetic flowmeter for a fully functional pump station as indicated, shown, specified or required to complete the work in strict conformity with the Contract Documents. The work also includes all specified, indicated and shown electrical equipment, appliances, appurtenances, furnishings, electro-magnetic flowmeter, instrumentation and controls, accessories, tests and sundry parts and material as shall be necessary and required for a completely operable installation satisfactory to the Engineer.
Lancaster Area Sewer Authority
Demolition of a 12-foot diameter steel lime silo and surrounding structure located overtop of the sludge loading garage as identified in the project manual.
Posted Date
Mar 9, 2026
Due Date
Apr 16, 2026
Release: Mar 9, 2026
Lancaster Area Sewer Authority
Close: Apr 16, 2026
Demolition of a 12-foot diameter steel lime silo and surrounding structure located overtop of the sludge loading garage as identified in the project manual.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lancaster Area Sewer Authority
The financial discussion included an overview of the Authority's financial activities for the fiscal years ending March 31, 2018 and 2017. Key topics encompassed the Authority's net position, revenue from sewer treatment and capacity charges, operating and nonoperating expenses, and capital assets. The discussion also covered budgetary highlights, capital assets and debt administration, a review of operations, and the business outlook, including revenue and operating expense projections, the Five Year Capital Improvements Plan, and fund allocations for various projects.
The Lancaster Area Sewer Authority's budget report for 2020-2021 includes an operating budget with a 2.75% sewer rental rate increase, an increase in the tapping fee, and a full year operation of completed biosolids handling equipment. It also covers the acquisition of the West Earl Sewer Authority and refinancing debt. The capital improvements budget includes rehabilitation of the Lower Little Conestoga Interceptor, expansion of the Landisville Interceptor, and upgrades to trucked waste receiving facilities. The five-year comprehensive plan includes annual sewer rental rate increases and the completion of a treatment plant upgrade and expansion.
The Lancaster Area Sewer Authority board revised the Operating Budget and the Capital Improvements Budget for the fiscal year April 1, 2020 -- March 31, 2021. The revisions were made due to the negative impact of COVID-19 on the commercial and industrial revenue stream and the delay in the acquisition of the West Earl Sewer System. The report summarizes the revisions to both budgets, including adjustments to revenue, expenses, and planned capital improvement projects.
The Lancaster Area Sewer Authority's budget for 2025-2026 includes an operating budget with a sewer rental rate increase, an increase in sewer rental income, and a decrease in other revenues. The capital improvements budget includes projects funded from existing reserves to rehabilitate sewer lines, replace buildings and equipment, and fund improvements at the City of Lancaster treatment facility. Projects are also funded from a COVID-19 ARPA H2OPA program grant and a loan from the Pennsylvania Infrastructure Investment program for pump station upgrades and the upgrade of the Blue Rock Water Resource Recovery Facility.
The budget report includes the operating budget, the capital improvements budget, and the five-year comprehensive plan. The operating budget covers sewer rental income, tapping fees, investment income, and other revenue sources, as well as expenses for salaries, utilities, maintenance, and contract services. The capital improvements budget outlines expenditures for collection system modifications, equipment purchases, and treatment plant upgrades. The five-year comprehensive plan provides projections for revenue and expenses.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lancaster Area Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge