Contract 25 - Rehabilitation of Existing Pump Station
Posted
Oct 1, 2026
Oct 29, 2026
Rehabilitation of an existing precast concrete submersible wastewater pumping station, including construction of an 8’ diameter off-line manhole for bypass pumping; bypass pumping operation; temporary portable electric powered pump; temporary diesel powered backup pump; low pressure sanitary sewer line connection to off-line manhole with isolation valves; installation of Owner-provided pump station structures, pumps, piping, valves, and fittings; force main connection to rehabilitated pump station; odor control system; and electric power and controls for electric service for bypass pumping operation and rehabilitated pump station power and controls.