Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lake Whatcom Water And Sewer District
Provide on-call technical support for the Owner's SCADA and telemetry systems. Work includes personal services on an on-call basis to troubleshoot, repair, modify and/or restore function of automated instrumentation, controls, telemetry, network communication, Supervisory Control and Data Acquisition (SCADA) system, and Programmable Logic Controllers (PLCs) at District facilities. Services may also consist of preventive maintenance, minor upgrades, and emergency repairs and replacements as necessary of those systems.
Posted Date
Apr 7, 2026
Due Date
Apr 29, 2026
Release: Apr 7, 2026
Lake Whatcom Water And Sewer District
Close: Apr 29, 2026
Provide on-call technical support for the Owner's SCADA and telemetry systems. Work includes personal services on an on-call basis to troubleshoot, repair, modify and/or restore function of automated instrumentation, controls, telemetry, network communication, Supervisory Control and Data Acquisition (SCADA) system, and Programmable Logic Controllers (PLCs) at District facilities. Services may also consist of preventive maintenance, minor upgrades, and emergency repairs and replacements as necessary of those systems.
AvailableLake Whatcom Water And Sewer District
purchase of a used dump truck.
Posted Date
Mar 10, 2025
Due Date
Mar 25, 2025
Release: Mar 10, 2025
Lake Whatcom Water And Sewer District
Close: Mar 25, 2025
purchase of a used dump truck.
Lake Whatcom Water And Sewer District
Construct 150 LF 8" sanitary sewer force main, pipe bridge, pipe bridge footings, and improvements includes 70 LF 8" HDPE piping (including excavation, bedding, and backfill), 1 LS suction quick connect assembly, 2 EA connection of existing 8" HDPE, 1 LS pin piles and pile caps, 1 LS pipe bridge - fabrication and installation, 80 LF 8" ductile iron piping, 1 LS site and surface restoration, 20 ton unscheduled bank run gravel for trench backfill.
Posted Date
Jan 16, 2025
Due Date
Feb 18, 2025
Release: Jan 16, 2025
Lake Whatcom Water And Sewer District
Close: Feb 18, 2025
Construct 150 LF 8" sanitary sewer force main, pipe bridge, pipe bridge footings, and improvements includes 70 LF 8" HDPE piping (including excavation, bedding, and backfill), 1 LS suction quick connect assembly, 2 EA connection of existing 8" HDPE, 1 LS pin piles and pile caps, 1 LS pipe bridge - fabrication and installation, 80 LF 8" ductile iron piping, 1 LS site and surface restoration, 20 ton unscheduled bank run gravel for trench backfill.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Lake Whatcom Water And Sewer District
This document includes Amendment No. 7 to the Architectural/Engineering Agreement between Lake Whatcom Water & Sewer District and RH2 Engineering, Inc. for Services During Construction for the Euclid Sewer Pump Station Improvements project. The amendment outlines the scope of work for construction administration, submittal review, on-site observation, testing, SCADA software development, and construction records, with a not-to-exceed amount of $79,767. This amendment contributes to a proposed total agreement price of $467,473 for the entire A/E agreement. The services are anticipated to commence in June 2022 and conclude by September 2023.
Effective Date
Jun 1, 2022
Expires
Effective: Jun 1, 2022
Lake Whatcom Water And Sewer District
Expires:
This document includes Amendment No. 7 to the Architectural/Engineering Agreement between Lake Whatcom Water & Sewer District and RH2 Engineering, Inc. for Services During Construction for the Euclid Sewer Pump Station Improvements project. The amendment outlines the scope of work for construction administration, submittal review, on-site observation, testing, SCADA software development, and construction records, with a not-to-exceed amount of $79,767. This amendment contributes to a proposed total agreement price of $467,473 for the entire A/E agreement. The services are anticipated to commence in June 2022 and conclude by September 2023.
Lake Whatcom Water And Sewer District
This document outlines a Professional Services Agreement for On-Call General Engineering Services between Lake Whatcom Water and Sewer District as the buyer and Wilson Engineering, LLC as the seller. The agreement establishes a framework for the provision of various engineering and surveying services on an as-needed task order basis. The master agreement is effective from August 3, 2021, and extends until July 31, 2026. Compensation will be determined per individual task order based on agreed-upon billing rates and allowable direct costs. The document also includes other distinct agenda items and reports from a Board of Commissioners meeting, separate from this specific agreement.
Effective Date
Aug 3, 2021
Expires
Effective: Aug 3, 2021
Lake Whatcom Water And Sewer District
Expires:
This document outlines a Professional Services Agreement for On-Call General Engineering Services between Lake Whatcom Water and Sewer District as the buyer and Wilson Engineering, LLC as the seller. The agreement establishes a framework for the provision of various engineering and surveying services on an as-needed task order basis. The master agreement is effective from August 3, 2021, and extends until July 31, 2026. Compensation will be determined per individual task order based on agreed-upon billing rates and allowable direct costs. The document also includes other distinct agenda items and reports from a Board of Commissioners meeting, separate from this specific agreement.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Lake Whatcom Water And Sewer District
The meeting agenda focuses on the selection of a new commissioner to fill the vacancy for Position No. 3. Key discussion items include interviewing applicants for the position, holding an executive session to evaluate candidate qualifications, and the formal nomination of a preferred candidate for appointment.
The Board of Commissioners meeting covered several key agenda items. Discussions included the approval of a Developer Extension Agreement for the Sudden Valley Community Association regarding a culvert replacement project, and the adoption of a revised Commissioner Protocol Manual which includes a new policy on social media use. The Board also reviewed general business matters, including the District's compensation philosophy and capital surplus policy creation, and received reports from the General Manager and various department managers.
The agenda for this meeting included several key items. Business included a presentation on Energy Savings Performance Contracts, and consideration for the adoption of Resolution No. 904 concerning the Update to District Design & Construction Standards. Staff reports were scheduled from the General Manager, Engineering Department, Finance Department, and Operations Department. The meeting also provided two public comment opportunities.
This Business Utilization Plan outlines the Lake Whatcom Water & Sewer District's strategy to increase the participation of small, minority, women, and veteran-owned businesses in its Small Works Roster direct contracting process. The plan aims to achieve a goal of awarding 50% of all small works projects to small and diverse businesses, thereby fostering broader engagement. Key elements include provisions for direct contracting under RCW 39.04.152(4)(b)(iv), a policy against repeatedly favoring contractors, and a commitment to annual assessment and public reporting of utilization achievements.
The meeting addressed several key operational and financial matters. On the consent agenda, the Board approved accounts payable vouchers and payroll matters, while explicitly excluding approval of the previous meeting's notes from the formal approval action documented. Key discussion centered on two capital improvement projects where bids exceeded budgeted amounts: the Country Club Horizontal Directional Drill Sewer Line Construction and the Geneva Sanitary Sewer Lift Station Renovation. For the Country Club project, the Board awarded the contract to Colacurcio Brothers, utilizing contingency funds. For the Geneva project, the Board authorized a transfer from the Sewer/Stormwater Contingency Fund to cover the shortfall and awarded the contract to Equity Builders. Additionally, the Board adopted Resolution No. 857, which revised the District Administrative Code by combining purchasing policies from Chapters 2.16 and 2.17 into a single, clarified chapter. The General Manager provided updates on social media presence, an open Maintenance Worker I position, crew training, and a recent side-sewer leak.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lake Whatcom Water And Sewer District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database