Coastal Flooding and Shoreline Erosion Protection Seawall
Jul 31, 2026
Closes
Aug 20, 2026
Kwikwasut'inuxw Haxwa'mis First Nation invites tenders for construction of the Coastal Flooding and Shoreline Erosion Protection Seawall on Gilford Island, British Columbia, covering three pocket beaches with a modular concrete block seawall, armour rock, beach nourishment, a boardwalk, and Awak'was pile-supported timber structures. This is a construction procurement (not a grant), with documents obtainable directly from KHFN as of July 20, 2026. The CanadaBuys notice lists the opportunity as open, posted 2026/07/31 with a closing time of 2026/08/20 17:00 EDT.
