Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
King County Water District 111
The scope of work consists of two schedules of work. Schedule A consists of construction of a 65-foot diameter, 3.0-million-gallon (MG) welded steel reservoir ("1400 Reservoir"). Schedule B consist of demolition of an existing 150,000-gallon elevated steel reservoir ("1100 Reservoir"). Schedule A consists of constructing a 3.0 MG welded steel reservoir that will include a wraparound staircase, inlet, outlet, drain, and overflow piping, active mixing system, access hatches and roof vents, level gauges, sample ports, access manways, a radio communication antenna, structural and electrical provisions for addition of a cell phone antenna on top of the reservoir, and an impressed current cathodic protection system; construction of a concrete masonry unit (CMU) building to include standing seam metal roof, electrical and control equipment, cathodic protection equipment, unit heater, dehumidifier, ventilation fan, water quality monitoring equipment (chlorine, pH, and temperature), inlet and outlet piping for the reservoir; seismic elements including Flex-Tend force-balanced flexible expansion seismic joints on inlet and outlet piping and incorporation of FLO-LOC seismic control equipment to control the flow of water out of the tank following a seismic event; Supervisory Control and Data Acquisition (SCADA) panel for communication, control, monitoring, and alarms of the tank site to be incorporated into the Owner's SCADA system; connections to existing water system; paved site access to the site from 124th Avenue SE; construction of a stormwater pond, on-site stormwater drainage, and a dispersion trench for the stormwater pond; site paving, grading, lighting, and security fencing; a new on-site diesel generator; and propane tank and accessories. Schedule B consist of demolition, removal and disposal wastehaul of the Owner's existing 1100 Reservoir, piping modifications, and site restoration.
Posted Date
Jul 22, 2026
Due Date
Aug 19, 2026
Release: Jul 22, 2026
King County Water District 111
Close: Aug 19, 2026
The scope of work consists of two schedules of work. Schedule A consists of construction of a 65-foot diameter, 3.0-million-gallon (MG) welded steel reservoir ("1400 Reservoir"). Schedule B consist of demolition of an existing 150,000-gallon elevated steel reservoir ("1100 Reservoir"). Schedule A consists of constructing a 3.0 MG welded steel reservoir that will include a wraparound staircase, inlet, outlet, drain, and overflow piping, active mixing system, access hatches and roof vents, level gauges, sample ports, access manways, a radio communication antenna, structural and electrical provisions for addition of a cell phone antenna on top of the reservoir, and an impressed current cathodic protection system; construction of a concrete masonry unit (CMU) building to include standing seam metal roof, electrical and control equipment, cathodic protection equipment, unit heater, dehumidifier, ventilation fan, water quality monitoring equipment (chlorine, pH, and temperature), inlet and outlet piping for the reservoir; seismic elements including Flex-Tend force-balanced flexible expansion seismic joints on inlet and outlet piping and incorporation of FLO-LOC seismic control equipment to control the flow of water out of the tank following a seismic event; Supervisory Control and Data Acquisition (SCADA) panel for communication, control, monitoring, and alarms of the tank site to be incorporated into the Owner's SCADA system; connections to existing water system; paved site access to the site from 124th Avenue SE; construction of a stormwater pond, on-site stormwater drainage, and a dispersion trench for the stormwater pond; site paving, grading, lighting, and security fencing; a new on-site diesel generator; and propane tank and accessories. Schedule B consist of demolition, removal and disposal wastehaul of the Owner's existing 1100 Reservoir, piping modifications, and site restoration.
AvailableKing County Water District 111
Construction of improvements to Well 6 source water and water treatment systems. The project consists of installing a new submersible well pump and motor (Well 6B), including power, controls and accessories, in existing well casing; wellhead improvements; new well piping, valves, and appurtenances; new wood-framed well building including controls room and wellhead room; new below-grade water main to/from Well 6A; new hatch and other improvements in Well 6A structure; improvements to the existing Water Treatment Building (WTB), including new on-site chlorine generation system, new fluoride system, new water quality analyzer, new backwash control valves and controls, new piping, valves, and appurtenances; an expansion of and improvements to the existing backwash vault and system; electrical improvements to support the project; a new on-site natural gas/propane generator; propane tank and accessories; and civil site work including fencing, hydroseeding, paving, sidewalk repair, and water services.
Posted Date
May 7, 2024
Due Date
Jun 13, 2024
Release: May 7, 2024
King County Water District 111
Close: Jun 13, 2024
Construction of improvements to Well 6 source water and water treatment systems. The project consists of installing a new submersible well pump and motor (Well 6B), including power, controls and accessories, in existing well casing; wellhead improvements; new well piping, valves, and appurtenances; new wood-framed well building including controls room and wellhead room; new below-grade water main to/from Well 6A; new hatch and other improvements in Well 6A structure; improvements to the existing Water Treatment Building (WTB), including new on-site chlorine generation system, new fluoride system, new water quality analyzer, new backwash control valves and controls, new piping, valves, and appurtenances; an expansion of and improvements to the existing backwash vault and system; electrical improvements to support the project; a new on-site natural gas/propane generator; propane tank and accessories; and civil site work including fencing, hydroseeding, paving, sidewalk repair, and water services.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge