Summary
Construction of improvements to Well 6 source water and water treatment systems. The project consists of installing a new submersible well pump and motor (Well 6B), including power, controls and accessories, in existing well casing; wellhead improvements; new well piping, valves, and appurtenances; new wood-framed well building including controls room and wellhead room; new below-grade water main to/from Well 6A; new hatch and other improvements in Well 6A structure; improvements to the existing Water Treatment Building (WTB), including new on-site chlorine generation system, new fluoride system, new water quality analyzer, new backwash control valves and controls, new piping, valves, and appurtenances; an expansion of and improvements to the existing backwash vault and system; electrical improvements to support the project; a new on-site natural gas/propane generator; propane tank and accessories; and civil site work including fencing, hydroseeding, paving, sidewalk repair, and water services.