Summary
Construction of a new water treatment facility consisting of a packaged gravity filtration system. Installation of major process equipment including submersible well pumps, packaged filters, vertical turbine pumps, positive displacement blowers, aeration injection system, chemical feed systems, and piping and valve systems. Construction of a new precast treatment building with buried concrete water tanks and site improvements. Installation of mechanical and electrical control systems. Installation of a backup emergency generator. Installation of a new public water supply well(s). Installation of new raw watermains, street patching, and paving. Demolition of the existing facility and site restoration. Water tower improvements including the addition of a tank mixer, level monitoring equipment, and isolation valve replacement.