Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Jamestown Park District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Executive Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Jamestown Park District
Supply, delivery and installation of playground equipment.
Posted Date
Jan 21, 2026
Due Date
Jan 30, 2026
Release: Jan 21, 2026
Jamestown Park District
Close: Jan 30, 2026
Supply, delivery and installation of playground equipment.
AvailableJamestown Park District
Project will consist of the following approximate quantities: parking lot construction, restroom construction, sidewalk, poured in place playground and playground equipment installation. Description: 1 ac of clearing and grubbing; 6 ea of tree & stump removal; 38 SY of removal of bituminous surfacing; 15 LF of removal of curb & gutter; 185 SY of removal of concrete pavement; 1 LS of removal of building; 1 LS of unclassified excavation; 458 CY of topsoil; 980 CY of common excavation subcut - waste; 621 CY of excess topsoil; 0.5 acre of seeding class i; 0.5 acre of temporary cover crop; 0.5 acre of hydraulic mulch; 1 LS of erosion control devices; 85 ton of salvaged base course; 3750 ton of aggregate base course CL 8; 45 gal of tack coat; 87 gal of fog seal. See outside link.
Posted Date
Mar 21, 2025
Due Date
Apr 14, 2025
Release: Mar 21, 2025
Jamestown Park District
Close: Apr 14, 2025
Project will consist of the following approximate quantities: parking lot construction, restroom construction, sidewalk, poured in place playground and playground equipment installation. Description: 1 ac of clearing and grubbing; 6 ea of tree & stump removal; 38 SY of removal of bituminous surfacing; 15 LF of removal of curb & gutter; 185 SY of removal of concrete pavement; 1 LS of removal of building; 1 LS of unclassified excavation; 458 CY of topsoil; 980 CY of common excavation subcut - waste; 621 CY of excess topsoil; 0.5 acre of seeding class i; 0.5 acre of temporary cover crop; 0.5 acre of hydraulic mulch; 1 LS of erosion control devices; 85 ton of salvaged base course; 3750 ton of aggregate base course CL 8; 45 gal of tack coat; 87 gal of fog seal. See outside link.
Jamestown Park District
The proposed playground site is currently an open space, with a nearby restroom facility, community room/warming house, and trees. The existing facilities, structures, and vegetation will be removed, replaced, and/or incorporated to aid in the placement of the new playground.
Posted Date
Nov 26, 2024
Due Date
Jan 10, 2025
Release: Nov 26, 2024
Jamestown Park District
Close: Jan 10, 2025
The proposed playground site is currently an open space, with a nearby restroom facility, community room/warming house, and trees. The existing facilities, structures, and vegetation will be removed, replaced, and/or incorporated to aid in the placement of the new playground.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.