Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Hood Canal Salmon Enhancement Group's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Hood Canal Salmon Enhancement Group
This project will restore salmon habitat along 1 mile of the Big Quilcene River in the vicinity of Quilcene, WA. Selected contractor will perform large scale stream restoration activities including actions to provide machine access to worksites, temporary stream bypasses to allow work to take place in the dry, excavation, removal and grading of channel banks and floodplains, installation of large wood, sorting and placement of streambed mix in the restored channel and floodplain footprint, spoils placement and grading, and other tasks required for the installation of the project as specified.
Posted Date
Jul 9, 2025
Due Date
Aug 28, 2025
Release: Jul 9, 2025
Hood Canal Salmon Enhancement Group
Close: Aug 28, 2025
This project will restore salmon habitat along 1 mile of the Big Quilcene River in the vicinity of Quilcene, WA. Selected contractor will perform large scale stream restoration activities including actions to provide machine access to worksites, temporary stream bypasses to allow work to take place in the dry, excavation, removal and grading of channel banks and floodplains, installation of large wood, sorting and placement of streambed mix in the restored channel and floodplain footprint, spoils placement and grading, and other tasks required for the installation of the project as specified.
Hood Canal Salmon Enhancement Group
Furnish timber to be used in engineered log jams. Approx. 880 trees with a minimum 30" DBH will need to be harvested, cur to create rootwad logs, timber piles, racking, and slash, and transported to Quilcene. Work includes: Sourcing, harvesting, and hauling timber, minor cleaning and site work, and sort and stage timber materials into organized log decks at the staging area.
Posted Date
Feb 5, 2025
Due Date
Mar 5, 2025
Release: Feb 5, 2025
Hood Canal Salmon Enhancement Group
Close: Mar 5, 2025
Furnish timber to be used in engineered log jams. Approx. 880 trees with a minimum 30" DBH will need to be harvested, cur to create rootwad logs, timber piles, racking, and slash, and transported to Quilcene. Work includes: Sourcing, harvesting, and hauling timber, minor cleaning and site work, and sort and stage timber materials into organized log decks at the staging area.
Hood Canal Salmon Enhancement Group
Project includes the replacement of 4 single lane road crossings over small creeks and wetland areas near the Big Quilcene River. Selected contractor will perform culvert/crossing replacement and stream restoration activities. These activities will include actions to provide machine access to worksites, temporary stream bypasses to allow work to take place in the dry, excavation, removal and grading of channel banks, procurement, haul and installation of culverts and bridges, sorting and placement of streambed mix in the restored channel, and other tasks required for the installation of the project as specified.
Posted Date
Feb 3, 2025
Due Date
Mar 5, 2025
Release: Feb 3, 2025
Hood Canal Salmon Enhancement Group
Close: Mar 5, 2025
Project includes the replacement of 4 single lane road crossings over small creeks and wetland areas near the Big Quilcene River. Selected contractor will perform culvert/crossing replacement and stream restoration activities. These activities will include actions to provide machine access to worksites, temporary stream bypasses to allow work to take place in the dry, excavation, removal and grading of channel banks, procurement, haul and installation of culverts and bridges, sorting and placement of streambed mix in the restored channel, and other tasks required for the installation of the project as specified.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.