Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Hiwassee Utilities Commission's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Hiwassee Utilities Commission
The work consists of replacing existing filter bank 1 wafer butterfly valves and pneumatic actuators with new AWWA flanged butterfly valves and pneumatic actuators, control wring and remote i/o panel and making piping modifications as required; providing new compressed air header in pipe gallery; tying in existing filter bank 2 pneumatic actuators to new air header; providing new south zone magnetic flow meter with electrical and signal wiring and associated piping changes; providing new raw water magnetic flow meter with electrical and signal wiring and associated piping changes, and miscellaneous ancillary work. See outside link.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Hiwassee Utilities Commission
Close: Feb 12, 2026
The work consists of replacing existing filter bank 1 wafer butterfly valves and pneumatic actuators with new AWWA flanged butterfly valves and pneumatic actuators, control wring and remote i/o panel and making piping modifications as required; providing new compressed air header in pipe gallery; tying in existing filter bank 2 pneumatic actuators to new air header; providing new south zone magnetic flow meter with electrical and signal wiring and associated piping changes; providing new raw water magnetic flow meter with electrical and signal wiring and associated piping changes, and miscellaneous ancillary work. See outside link.
AvailableHiwassee Utilities Commission
Installing a new double wall bulk storage tank, new piping, and concrete repairs/restoration.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Hiwassee Utilities Commission
Close: Dec 16, 2025
Installing a new double wall bulk storage tank, new piping, and concrete repairs/restoration.
Hiwassee Utilities Commission
Project consists of replacing the existing membrane baffle system and support components and installing a diversion elbow on the influent waterline.
Posted Date
Aug 11, 2025
Due Date
Sep 4, 2025
Release: Aug 11, 2025
Hiwassee Utilities Commission
Close: Sep 4, 2025
Project consists of replacing the existing membrane baffle system and support components and installing a diversion elbow on the influent waterline.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.