Heath Water Wells 2 & 4
Posted
Sep 15, 2026
Oct 13, 2026
Work inlcudes 480 LF trench safety plan preparation and implementation; 152 LF c900 pvc water pipe (dr 18)(8-in)(open-cut); 328 LF ansi/awwa c151/a21.51 ductile iron water pipe (class 350)(8- in)(open-cut); 1 EA 18" actuated butterfly valve and vault; 3 EA connect to existing water line; 2 EA new groundwater well drilling; 2 EA new groundwater well pump equipment; 1 LS electrical and instrumentation; 2 EA chloramine disinfection; 54 LF remove and replace ornamental steel fence. See attached file.
