Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Headwaters Soil And Water Conservation District
Seeking to conduct a one-day household hazardous waste (HHW) collection event.
Posted Date
Jul 8, 2026
Due Date
Jul 23, 2026
Release: Jul 8, 2026
Headwaters Soil And Water Conservation District
Close: Jul 23, 2026
Seeking to conduct a one-day household hazardous waste (HHW) collection event.
AvailableHeadwaters Soil And Water Conservation District
Procure wood waste and stump grinding services.
Posted Date
Apr 24, 2026
Due Date
Apr 29, 2026
Release: Apr 24, 2026
Headwaters Soil And Water Conservation District
Close: Apr 29, 2026
Procure wood waste and stump grinding services.
Headwaters Soil And Water Conservation District
1. Furnish all labor, equipment, and supervision necessary for a 16” and 36” bore across Interstate 64 at mile marker, 93.3 through an existing 54” corrugated casing each totaling 375 LF. The contractor will be responsible, for the skids necessary to slide the new casing through the existing corrugated pipe. 2. Furnish all labor, equipment, and supervision necessary to install the 6” and 16” carrier pipe through the 16” and 36” casings. 3. Furnish all labor, equipment, and supervision necessary to install the 104 CY of flowable fill in the 54” casing over the 16” casing and 36” casing. 4. Augusta Water (AW) shall provide the following: 1) Removal of existing water line and piers throughout existing 54” corrugated pipe. 2) Excavated Bore and Receiving Pit with a 6” gravel bed. 3) 16” steel 0.5” thick casing, 4) 6” DI MJ pipe, 5) 36” steel 0.5” thick casing, 6) 16” DI MJ pipe, 7) Spiders for the 6” pipe and 16” pipe, 8) Flowable Fill, 9) Temporary framing/support for Flowable Fill Casing End Seal, 10) Casing End Seals.
Posted Date
Feb 17, 2026
Due Date
Mar 19, 2026
Release: Feb 17, 2026
Headwaters Soil And Water Conservation District
Close: Mar 19, 2026
1. Furnish all labor, equipment, and supervision necessary for a 16” and 36” bore across Interstate 64 at mile marker, 93.3 through an existing 54” corrugated casing each totaling 375 LF. The contractor will be responsible, for the skids necessary to slide the new casing through the existing corrugated pipe. 2. Furnish all labor, equipment, and supervision necessary to install the 6” and 16” carrier pipe through the 16” and 36” casings. 3. Furnish all labor, equipment, and supervision necessary to install the 104 CY of flowable fill in the 54” casing over the 16” casing and 36” casing. 4. Augusta Water (AW) shall provide the following: 1) Removal of existing water line and piers throughout existing 54” corrugated pipe. 2) Excavated Bore and Receiving Pit with a 6” gravel bed. 3) 16” steel 0.5” thick casing, 4) 6” DI MJ pipe, 5) 36” steel 0.5” thick casing, 6) 16” DI MJ pipe, 7) Spiders for the 6” pipe and 16” pipe, 8) Flowable Fill, 9) Temporary framing/support for Flowable Fill Casing End Seal, 10) Casing End Seals.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge