2026 Lift Station No. 5 Improvements RFP
Posted
-
Dec 10, 2026
Proposed work includes but is not limited to clean and degrit the wet well; blast and recoat the wet well piping and aboveground piping including valves, fittings, vent, and spool pieces; demolition of the existing wet well safety net and replacement with a rigid safety grate; demolition and replacement of concrete thrust blocks; demolition of T-Lock liner; blasting the wet well walls, floor, and underside of the top slab; application of one-inch (1") of concrete repair mortar and a 100% solids epoxy coating system to all areas of the wet well walls and underside of the top slab; replacement of control panel and terminal boxes; site restoration and installation, rental, and operation of a temporary bypass system.