Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Harris County Utility District 14
Harris County Improvement District No. 14 is soliciting sealed bids for the construction of water, sanitary sewer, and storm sewer facilities, as well as reinforced concrete paving, for Mason Road at Dunham Pointe Street Dedication (Section 1) and Dunham Pointe (Section 25). Bids are due by 2:30 PM local time on March 10, 2026, with a non‑mandatory pre‑bid conference on March 3, 2026. The project includes approximately 1,830 LF of 8‑inch water line, 1,750 LF of 8‑inch sanitary pipe, 1,385 LF of 24‑36 inch storm pipe, and concrete pavement sections.
Posted Date
-
Due Date
Mar 10, 2026
Harris County Utility District 14
Close: Mar 10, 2026
Harris County Improvement District No. 14 is soliciting sealed bids for the construction of water, sanitary sewer, and storm sewer facilities, as well as reinforced concrete paving, for Mason Road at Dunham Pointe Street Dedication (Section 1) and Dunham Pointe (Section 25). Bids are due by 2:30 PM local time on March 10, 2026, with a non‑mandatory pre‑bid conference on March 3, 2026. The project includes approximately 1,830 LF of 8‑inch water line, 1,750 LF of 8‑inch sanitary pipe, 1,385 LF of 24‑36 inch storm pipe, and concrete pavement sections.
AvailableHarris County Utility District 14
The work consist of approx 2,228 LF 8" PVC water line; 414 LF 16" steel encasement; 3,620 LF trench safety system; 15 EA precast concrete manholes; 1,503 LF 8" PVC sewer; 500 LF trench dewatering; 1,180 LF RCP sewer; 2 EA cofferdam; 12,230 LF reinforced filter fabric fence.
Posted Date
Aug 22, 2025
Due Date
Sep 9, 2025
Release: Aug 22, 2025
Harris County Utility District 14
Close: Sep 9, 2025
The work consist of approx 2,228 LF 8" PVC water line; 414 LF 16" steel encasement; 3,620 LF trench safety system; 15 EA precast concrete manholes; 1,503 LF 8" PVC sewer; 500 LF trench dewatering; 1,180 LF RCP sewer; 2 EA cofferdam; 12,230 LF reinforced filter fabric fence.
Harris County Utility District 14
Approx. 9,700 SY of 6" concrete reinforced pavement with 6" subgrade and curb, 1,600 SY of 7" concrete reinforced pavement and 370 SY of 10" concrete reinforced pavement with 8" subgrade and curb.
Posted Date
Aug 1, 2025
Due Date
Aug 12, 2025
Release: Aug 1, 2025
Harris County Utility District 14
Close: Aug 12, 2025
Approx. 9,700 SY of 6" concrete reinforced pavement with 6" subgrade and curb, 1,600 SY of 7" concrete reinforced pavement and 370 SY of 10" concrete reinforced pavement with 8" subgrade and curb.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Harris County Utility District 14's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Harris County Utility District 14's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database