HCMUD No. 560 Excavation, Paving and Grading To Serve Crosby Farms, Sec. 6 and Crosby Farms, Sec. 8
Posted
Jul 17, 2026
Oct 16, 2026
Work consist of 10,464 cy of roadway excavation, 3,540 cy of lot manipulation/excavatio, 3,670 lf of 4" x 12" reinforced concrete curb, 1,439 lf of 6" reinforced concrete curb, 8,750 sy of 6" reinforced concrete pavement, 9,883 sy of 8" stabilized subgrade preparation, 77 ea of lot grading (inclusive of sidelot swale excavation per grading sheet detail, complete in place), 100 lf of 8-inch, sch-40 pvc irrigation/electrical sleeve, 100 lf of 6", sch-40 pvc irrigation/electrical sleeve, 100 lf of 4", sch-40 pvc irrigation/electrical sleeve. See attached file.