HCMUD No. 81 Cinco Regional WWTP Access Road Bridge Wingwall Rehabilitation RFP
Posted
-
Oct 6, 2026
Construction activities include but are not limited to the removal of the fractured concrete wingwall and replacement with a new wingwall structure. The contractor is to saw cut the existing wingwall, remove and dispose of concrete, excavate eroded soil and place temporary shoring. The installation of the proposed concrete wingwall will include forming concrete structure, raising settled portion of wingwall, repair of cracked areas, replacing pipe supports as directed by engineer and repair of guardrail. Site restoration to include solid sod strips and hydromulching.
