Construction of Lift Station No. 1-5 Generator Addition
-
Closes
Aug 25, 2026
Excavate, furnish, install, and backfill for generators, install, and backfill as required for (5) reinforced concrete foundations for load banks, and install five (5) proposed natural gas emergency generators with sound attenuation enclosure on five (5) lift station sites. Construction activities include but are not limited to load banks, switch gear, and transfer gear. Contractor shall restore all disturbed areas of each site associated with the addition of the five (5) proposed generators. Contractor to regrade, relevel, and hydro mulch seed affected areas after construction is complete. Complete in place.