Wastewater Grinder Station and Low Pressure Sewer RFP
Posted
Oct 20, 2026
Nov 30, 2026
Project consists of the demolition of the existing wastewater treatment facility and the construction of a new grinder station, a section of gravity sewer, approximately 2,642 linear feet of 2-inch HDPE DR11 low-pressure sewer installed via horizontal directional drilling, and epoxy lining of two manholes and one lift station wet well. The low-pressure sewer route will also include air release valves, in-line flushing connections, and 6-inch casing pipe at the State Route 81 crossing.