Halifax, NC - IXA - Corporate Development Area (RE-BID)
Aug 7, 2026
Closes
Aug 24, 2026
Work includes 920 LF installation and removal of silt fence; 4 EA silt fence outlet; 4 ton rip rap inlet/outlet protection; 6 EA rip rap check dams; 5 EA drop inlet protection; 1 EA temporary construction entrance pad; 500 SY pavement milling - 2" depth; 110 LF pipe removal - any size; 4 EA drainage/sanitary sewer structure removal; 1 EA stop sign removal; 300 LF pipe abandonment; 4 EA tree removal; 13,000 CY unclassified excavation/embankment. See outside link.