FM 237 TXDOT Coleto Creek Pipeline Relocation RFP
-
Closes
Sep 15, 2026
The Guadalupe-Blanco River Authority is requesting proposals for construction of the FM 237 TXDOT Coleto Creek Pipeline Relocation project. The work includes approximately 111 linear feet of open-cut, 48-inch flanged split steel casing welded to the existing carbon steel encasement, approximately 59 linear feet of concrete trench cap, erosion controls, site restoration, and seeding. The estimated project cost is $405,000, with a mandatory meeting scheduled for August 31, 2026, and bids due September 15, 2026, at 12:00 PM; this is a construction solicitation, not a grant program.