Arc Flash
Aug 12, 2026
Closes
Sep 10, 2026
Provide an Arc flash hazard study for the electrical distribution system. The intent of the Arc flash hazard study is to determine hazards that exist at each major piece of electrical equipment. This includes, but not limited to switchgear, switchboards, panelboards, motor control centers, PDUs, UPS, ATSs, and transformers. Contract term: 1 year.