Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Greater Honesdale Partnership
Connector Project: a) Mobilization to the site and staging. b) Material purchase and installation of temporary erosion and sediment control measures per the approved Erosion and Sediment Control Plan. c) Demolition and site preparation for proposed project items; including land clearing and rough grading, per the plan drawings and specifications. d) Contact and coordination with subsurface utility providers, including moving utility poles, installation of fire hydrant and high pressure line by others, adjustments to manholes, and moving/removal of the gas utility bank. e) Installation of all necessary conduit, sleeving, and protections for all subsurface utilities, per code; including placing the existing stormwater drainage pipe through the proposed concrete retaining wall. f) Installation of the power panel, electric lines, GFIs, and lights (Electric System). g) Installation of the Stormwater Conveyance System. h) Installation of the Concrete Retaining Wall. i) Installation of the Concrete Curb; including the Concrete Mountable Curb. j) Installation of the ‘Stop’ sign, ‘One Way’ signs, ‘Wrong Way’ signs, ‘Curb Your Vehicle’ signs, ADA parking signs, and parking meters. k) Installation of Trees and Plants; including topsoil, compost, and mulch. l) Installation of the concrete benches. m) Installation of the Concrete Bike Rack Pad and the Concrete Trash Receptacle Pads. n) Installation of the Decorative Fence with Sign Inlay(s). o) Installation of the Cable Fencing. p) Installation of the Concrete Sidewalk; including the Decorative Band, ADA Ramps with Truncated Domes, and Driveway Aprons. q) Installation of the Concrete Plaza area; including the terrazzo recycled glass application(s). r) Installation of the asphalt paving. s) The milling and paving of the one lane asphalt street. t) The milling for and installation of the Thermoplastic Crosswalk. u) The milling for and installation of the Sharrows. v) The installation of the painted Stop Bar. w) The installation of the painted Crosswalk. x) The installation of the Trash Receptacles and Bike Rack. y) Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. z) The removal of all construction materials; including all temporary erosion and sediment control BMPs.
Posted Date
Apr 22, 2026
Due Date
Jun 12, 2026
Release: Apr 22, 2026
Greater Honesdale Partnership
Close: Jun 12, 2026
Connector Project: a) Mobilization to the site and staging. b) Material purchase and installation of temporary erosion and sediment control measures per the approved Erosion and Sediment Control Plan. c) Demolition and site preparation for proposed project items; including land clearing and rough grading, per the plan drawings and specifications. d) Contact and coordination with subsurface utility providers, including moving utility poles, installation of fire hydrant and high pressure line by others, adjustments to manholes, and moving/removal of the gas utility bank. e) Installation of all necessary conduit, sleeving, and protections for all subsurface utilities, per code; including placing the existing stormwater drainage pipe through the proposed concrete retaining wall. f) Installation of the power panel, electric lines, GFIs, and lights (Electric System). g) Installation of the Stormwater Conveyance System. h) Installation of the Concrete Retaining Wall. i) Installation of the Concrete Curb; including the Concrete Mountable Curb. j) Installation of the ‘Stop’ sign, ‘One Way’ signs, ‘Wrong Way’ signs, ‘Curb Your Vehicle’ signs, ADA parking signs, and parking meters. k) Installation of Trees and Plants; including topsoil, compost, and mulch. l) Installation of the concrete benches. m) Installation of the Concrete Bike Rack Pad and the Concrete Trash Receptacle Pads. n) Installation of the Decorative Fence with Sign Inlay(s). o) Installation of the Cable Fencing. p) Installation of the Concrete Sidewalk; including the Decorative Band, ADA Ramps with Truncated Domes, and Driveway Aprons. q) Installation of the Concrete Plaza area; including the terrazzo recycled glass application(s). r) Installation of the asphalt paving. s) The milling and paving of the one lane asphalt street. t) The milling for and installation of the Thermoplastic Crosswalk. u) The milling for and installation of the Sharrows. v) The installation of the painted Stop Bar. w) The installation of the painted Crosswalk. x) The installation of the Trash Receptacles and Bike Rack. y) Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. z) The removal of all construction materials; including all temporary erosion and sediment control BMPs.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Greater Honesdale Partnership's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database