East Glorieta Distribution Waterline RFP
Jul 28, 2026
Closes
Aug 25, 2026
Installation of approx 3,450 LF of 6" pvc waterline within the project area, including trenching, pipe installation, backfilling, installation of valves and hydrants, connections to new and existing water meters, and tie-ins to the existing municipal water system.