Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Grand Strand Water And Sewer Authority
The Grand Strand Water & Sewer Authority (GSWSA) is soliciting construction bids for the Conway Parallel Transmission Main to add a new 24-inch transmission main (approximately 60,000 linear feet) to increase system capacity and resiliency. The project is financed in part by the Drinking Water State Revolving Fund (DWSRF) and has an estimated cost in the mid-twenties of millions USD; GSWSA has discussed the project in public notices and board materials. The BidNet Direct posting lists the solicitation (No. 676-01) published 2026-05-08 with bids due 2026-06-10 at 2:00 PM EDT.
Posted Date
May 8, 2026
Due Date
Jun 10, 2026
Release: May 8, 2026
Grand Strand Water And Sewer Authority
Close: Jun 10, 2026
The Grand Strand Water & Sewer Authority (GSWSA) is soliciting construction bids for the Conway Parallel Transmission Main to add a new 24-inch transmission main (approximately 60,000 linear feet) to increase system capacity and resiliency. The project is financed in part by the Drinking Water State Revolving Fund (DWSRF) and has an estimated cost in the mid-twenties of millions USD; GSWSA has discussed the project in public notices and board materials. The BidNet Direct posting lists the solicitation (No. 676-01) published 2026-05-08 with bids due 2026-06-10 at 2:00 PM EDT.
AvailableGrand Strand Water And Sewer Authority
Contractor to replace two (2) existing sewer force main valves. The existing force mains are at a depth of approximately 12' -15' below existing grade. This project includes the following: 1. Dewater existing 16” and 24” sewer force mains with the authority s assistance. 2. Excavate and remove existing 16” and 24” valves. 3. Install new 16” and 24” plug valves provided by the authority. 4. Backfill and compact in lifts, and restore all disturbed areas to original condition, or better. 5. Dispose of existing valves.
Posted Date
Mar 26, 2026
Due Date
Apr 9, 2026
Release: Mar 26, 2026
Grand Strand Water And Sewer Authority
Close: Apr 9, 2026
Contractor to replace two (2) existing sewer force main valves. The existing force mains are at a depth of approximately 12' -15' below existing grade. This project includes the following: 1. Dewater existing 16” and 24” sewer force mains with the authority s assistance. 2. Excavate and remove existing 16” and 24” valves. 3. Install new 16” and 24” plug valves provided by the authority. 4. Backfill and compact in lifts, and restore all disturbed areas to original condition, or better. 5. Dispose of existing valves.
Grand Strand Water And Sewer Authority
Rehabilitate the manholes and wet wells. Protective epoxy coating to eliminate infiltration, provide corrosion protection, repair voids, and enhance structural integrity for protecting and/or rehabilitating concrete and masonry manholes.
Posted Date
Feb 24, 2026
Due Date
Mar 12, 2026
Release: Feb 24, 2026
Grand Strand Water And Sewer Authority
Close: Mar 12, 2026
Rehabilitate the manholes and wet wells. Protective epoxy coating to eliminate infiltration, provide corrosion protection, repair voids, and enhance structural integrity for protecting and/or rehabilitating concrete and masonry manholes.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Grand Strand Water And Sewer Authority
The board meeting agenda includes a presentation of a Rate and Impact Fee Study and several action items, specifically the authorization of a $20,000,000 loan from the South Carolina Water Quality Revolving Fund Authority for the Perry Road Pump Station upgrade, and capital budget appropriation requests for various rural water and sewer projects. Division reports will cover financial statements, investment analysis, treatment plant operations, regulatory compliance, field activities, capital project statuses, customer reporting, human resources, and technology updates. Additionally, the meeting will cover employee recognition, reports on sod donations, and scheduling for a future budget retreat, followed by an executive session for personnel, contractual, and legal matters.
The board meeting agenda focused on the discussion and potential action regarding the Purchase and Sale Agreement between the Grand Strand Water and Sewer Authority and ASIS Boats USA, LLC.
This strategic plan for Grand Strand Water and Sewer Authority outlines its long-term direction to provide water and wastewater services, protect public health and the environment, and promote economic development and quality of life. Key strategic priorities include enhancing customer and stakeholder engagement, developing a dedicated workforce, supporting expansion and economic development, optimizing operations, ensuring regulatory compliance, maintaining reliable infrastructure, and leveraging technology and innovation. The plan aims to guide decisions for efficient resource use, meet growing customer needs through 2040, and maintain its position as a preferred service provider with quality and value.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Grand Strand Water And Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge