Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Golden Gate Bridge Hwy Transportation Dist
Work consists of scheduled drydocking and capital improvements.
Posted Date
Jun 2, 2026
Due Date
Jul 7, 2026
Release: Jun 2, 2026
Golden Gate Bridge Hwy Transportation Dist
Close: Jul 7, 2026
Work consists of scheduled drydocking and capital improvements.
AvailableGolden Gate Bridge Hwy Transportation Dist
Work consists of disconnect and remove camels for work at CONTR's location; make repairs to the mooring camels steel structure; replace specified components; renew protective coatings system; provide new floatation; upgrade vessel servicing systems, including the fuel transfer system, bilge water system; installation of a new diesel exhaust fluid (def) transfer system; reinstall and connect camels; replace the fixed spill containment booming at berths 1 & 2.
Posted Date
Jun 1, 2026
Due Date
Jul 9, 2026
Release: Jun 1, 2026
Golden Gate Bridge Hwy Transportation Dist
Close: Jul 9, 2026
Work consists of disconnect and remove camels for work at CONTR's location; make repairs to the mooring camels steel structure; replace specified components; renew protective coatings system; provide new floatation; upgrade vessel servicing systems, including the fuel transfer system, bilge water system; installation of a new diesel exhaust fluid (def) transfer system; reinstall and connect camels; replace the fixed spill containment booming at berths 1 & 2.
AvailableGolden Gate Bridge Hwy Transportation Dist
The Golden Gate Bridge, Highway and Transportation District is seeking environmental and engineering consultant services for maintenance dredging and pile repairs at the Larkspur Ferry Terminal. The selected consultant will be responsible for hydrographic surveys, sediment sampling, permitting coordination, and the preparation of construction drawings for an estimated 500,000 cubic yards of dredging. Work is scheduled for the 2027 environmental window, and proposers must comply with a 9.5% Small Business Enterprise goal.
Posted Date
May 13, 2026
Due Date
Jun 10, 2026
Release: May 13, 2026
Golden Gate Bridge Hwy Transportation Dist
Close: Jun 10, 2026
The Golden Gate Bridge, Highway and Transportation District is seeking environmental and engineering consultant services for maintenance dredging and pile repairs at the Larkspur Ferry Terminal. The selected consultant will be responsible for hydrographic surveys, sediment sampling, permitting coordination, and the preparation of construction drawings for an estimated 500,000 cubic yards of dredging. Work is scheduled for the 2027 environmental window, and proposers must comply with a 9.5% Small Business Enterprise goal.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Golden Gate Bridge Hwy Transportation Dist
The public hearing focused on Assembly Bill 2561 concerning the status of job vacancies within the district. Staff presented data on current vacancies across various bargaining units, including patrol officers, cement masons, bus operators, and engineering roles, while highlighting recruitment and retention efforts. The presentation also addressed adjustments to staffing levels due to operational needs and financial considerations. A representative from the local union shared concerns regarding the number of vacancies and the impact on growth potential. The board confirmed that the district's public outreach efforts met legal requirements, and future reports and recommendations will be brought to the appropriate committee.
The Board of Directors held a meeting that included public comments regarding climate change concerns, requests for the reinstatement of the 101 bus route stops at Spencer Avenue, and recognition of the bridge's anniversary. The General Manager's report covered transit ridership trends, the potential impact of proposed California Air Resources Board regulations on transit funding, and federal surface transportation legislation. Additionally, the Board conducted employee recognition, specifically honoring a retiring Lieutenant for over 40 years of service.
The board ratified actions regarding investments, expenditures, and the December 2025 investment report. Approval was granted for an emergency contract for repairs to the Golden Gate Bridge electrical system. The board authorized an amendment to a professional services agreement for the San Francisco Ferry Terminal ramp rehabilitation and approved a capital budget increase for the project. Additionally, the board authorized the execution of on-call professional support services contracts for grant and project support, accepted the independent auditor's single audit report, and selected new officers for the board.
The Board of Directors ratified actions taken by the Auditor-Controller, including commitments, expenditures, and investment reports. They authorized an amendment to the inter-agency agreement with the Marin County Transit District for local fixed-route bus services. The Board approved the award of a contract for boom lift rental services for bridge access and awarded contracts for vessel engines, gearboxes, drivelines, and waterjet propulsion systems. Additionally, the Board renewed the annual delegation of investment management authority, amended the Investment Policy, and received the independent auditor's engagement letter for the upcoming financial audit.
The Board of Directors ratified investment and financial reports, approved the contract for an Online Solicitation Management System, and authorized participation in the Low Carbon Transit Operations Program including a grant application for a ferry replacement project. The meeting also included establishing a public hearing for job vacancy reporting requirements, executing an amendment for benefit administration services, and implementing updates to board rules and remote meeting policies regarding open meeting requirements. Additionally, the Board selected new Officers to serve through 2027.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Golden Gate Bridge Hwy Transportation Dist's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Auditor-Controller and Chief Financial Officer
Premium
Access the largest public sector contact database
© 2026 Starbridge