Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Gilbert-Summit Rural Community Water District
Work shall consist of all site preparation and civil work shown on the plans; installation of the owner-provided packaged booster station, including unloading, crane-assisted placement and anchoring; installation of booster pumps and associated equipment, if not pre-installed by the manufacturer; installation of the standby generator and site fencing; all associated electrical, instrumentation, and control work; connection of the booster station to the storage tank discharge piping and the 16-inch water main; construction of the 16-inch water main and installation of all associated appurtenances; and startup, testing and commissioning of the completed system.
Posted Date
Jun 23, 2026
Due Date
Jul 8, 2026
Release: Jun 23, 2026
Gilbert-Summit Rural Community Water District
Close: Jul 8, 2026
Work shall consist of all site preparation and civil work shown on the plans; installation of the owner-provided packaged booster station, including unloading, crane-assisted placement and anchoring; installation of booster pumps and associated equipment, if not pre-installed by the manufacturer; installation of the standby generator and site fencing; all associated electrical, instrumentation, and control work; connection of the booster station to the storage tank discharge piping and the 16-inch water main; construction of the 16-inch water main and installation of all associated appurtenances; and startup, testing and commissioning of the completed system.
AvailableGilbert-Summit Rural Community Water District
The work consist of 135 LF test well drilling; 70 LF 20" steel pipe for outer casing; 250 LF chain link fence with gate; 1,724 12" PVC water line; 1 LS 300 GPM well pump.
Posted Date
Feb 2, 2026
Due Date
Mar 4, 2026
Release: Feb 2, 2026
Gilbert-Summit Rural Community Water District
Close: Mar 4, 2026
The work consist of 135 LF test well drilling; 70 LF 20" steel pipe for outer casing; 250 LF chain link fence with gate; 1,724 12" PVC water line; 1 LS 300 GPM well pump.
Gilbert-Summit Rural Community Water District
Provide 6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
Posted Date
Oct 27, 2025
Due Date
Dec 2, 2025
Release: Oct 27, 2025
Gilbert-Summit Rural Community Water District
Close: Dec 2, 2025
Provide 6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge