Summary
Work shall consist of all site preparation and civil work shown on the plans; installation of the owner-provided packaged booster station, including unloading, crane-assisted placement and anchoring; installation of booster pumps and associated equipment, if not pre-installed by the manufacturer; installation of the standby generator and site fencing; all associated electrical, instrumentation, and control work; connection of the booster station to the storage tank discharge piping and the 16-inch water main; construction of the 16-inch water main and installation of all associated appurtenances; and startup, testing and commissioning of the completed system.