Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Georgetown University
Replacement and repair of the existing low sloped roof and stabilization of the Cupola. This includes all components to the roof but not limited to the following: roof membrane assemblies, valleys, dormers, skylight systems, shingles, lightning protection, metal copings, roof drains, sealant.
Posted Date
Feb 2, 2026
Due Date
Mar 9, 2026
Release: Feb 2, 2026
Georgetown University
Close: Mar 9, 2026
Replacement and repair of the existing low sloped roof and stabilization of the Cupola. This includes all components to the roof but not limited to the following: roof membrane assemblies, valleys, dormers, skylight systems, shingles, lightning protection, metal copings, roof drains, sealant.
AvailableGeorgetown University
Project is the interior renovation. The interior renovation consists of demolishing the existing partitions, seating, stage, flooring , ceiling, light fixtures, electrical and low-voltage infrastructure, plumbing, and hvac system; all of these will be replaced entirely with new. Moreover, many of the windows along the auditorium space and the surrounding building will need to be replaced (glazing + frame, sill, etc.) and exterior access scaffolding and equipment will assist.
Posted Date
Jan 7, 2026
Due Date
Jan 21, 2026
Release: Jan 7, 2026
Georgetown University
Close: Jan 21, 2026
Project is the interior renovation. The interior renovation consists of demolishing the existing partitions, seating, stage, flooring , ceiling, light fixtures, electrical and low-voltage infrastructure, plumbing, and hvac system; all of these will be replaced entirely with new. Moreover, many of the windows along the auditorium space and the surrounding building will need to be replaced (glazing + frame, sill, etc.) and exterior access scaffolding and equipment will assist.
Georgetown University
Project consists of removal of interior finishes and non-load bearing interior partition walls. See outside link.
Posted Date
-
Due Date
Jun 3, 2025
Georgetown University
Close: Jun 3, 2025
Project consists of removal of interior finishes and non-load bearing interior partition walls. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Georgetown University
This document provides recommendations for enhancing New York State's Foundation Aid Formula for K-12 public education. The key areas of focus include implementing a public process with marginalized voices, exploring alternative methodologies for base cost assessment, refining student poverty measurements, and conducting cost studies for additional resource needs in student poverty, multilingual learners, and special education. The recommendations also address improving the measurement of school district wealth and phasing out inequitable aid provisions. The overall objective is to update the formula to ensure an equitable, adequate, and just distribution of resources for all New York students.
The strategic plan for Georgetown University focuses on improving the world through knowledge and leadership. Key areas of focus include strengthening academic research competitiveness, leveraging assets to address global issues, and strengthening financial resources. Targeted outcomes include enhancing faculty excellence, student access, and the university's Catholic and Jesuit identity, as well as addressing issues such as public policy, globalization, interreligious understanding, and life sciences.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Georgetown University's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Georgetown University's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Dean and William R. Berkley Chair, McDonough School of Business
Premium
Access the largest public sector contact database