2026 Gambier Library Storm Sewer Improvements
Posted
Sep 12, 2026
Sep 29, 2026
Work includes 355 SF sidewalk removed, 146 CY roadway excavation and embankment, 1335 sy pavement planing, 107 gal tack coat, 51 CY asphalt concrete, surface course, type 1, 30 CY asphalt concrete, intermediate course, 4 EA 6" roof drain pipe connection, 355 SF 4" concrete walk, maintaining traffic. See attached file.
