Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Galveston County Municipal Utility District No. 57
Work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct Lift Station No. 2 including but not limited to, mobilization, bonds and insurance; construction of a 10-foot (10') diameter concrete wet well including 100% solids epoxy coating, complete with two (2) submersible pumps, riser piping, valves, coatings, odor control system, brick and concrete fence and gates, site work, concrete access drive, concrete pavement and bollards, hose bibb, 2-inch (2") PVC potable water piping, 8-inch (8") PVC sanitary sewer force main and connection to sanitary sewer force main stub out by others, on-site sanitary sewer manhole, 10-inch (10") and 12-inch (12") PVC sanitary sewer and connection to existing sanitary sewer stub out, one (1) 45-kW natural gas engine driven generator with sound attenuated weatherproof level 2 enclosure, generator concrete foundation, 2-inch (2") natural gas line and meter, automatic transfer switch, load bank testing, electrical service, electrical service rack, disconnect switches, conduit, wire, service rack and control panel concrete pad, terminal boxes, lighting, miscellaneous electrical, sunshade canopy, miscellaneous site work, site restoration, and all else specified and shown in the construction documents and not specifically addressed in separate bid items, including adjustments and work necessary for a complete fully functioning lift station.
Posted Date
Feb 18, 2026
Due Date
Mar 12, 2026
Release: Feb 18, 2026
Galveston County Municipal Utility District No. 57
Close: Mar 12, 2026
Work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct Lift Station No. 2 including but not limited to, mobilization, bonds and insurance; construction of a 10-foot (10') diameter concrete wet well including 100% solids epoxy coating, complete with two (2) submersible pumps, riser piping, valves, coatings, odor control system, brick and concrete fence and gates, site work, concrete access drive, concrete pavement and bollards, hose bibb, 2-inch (2") PVC potable water piping, 8-inch (8") PVC sanitary sewer force main and connection to sanitary sewer force main stub out by others, on-site sanitary sewer manhole, 10-inch (10") and 12-inch (12") PVC sanitary sewer and connection to existing sanitary sewer stub out, one (1) 45-kW natural gas engine driven generator with sound attenuated weatherproof level 2 enclosure, generator concrete foundation, 2-inch (2") natural gas line and meter, automatic transfer switch, load bank testing, electrical service, electrical service rack, disconnect switches, conduit, wire, service rack and control panel concrete pad, terminal boxes, lighting, miscellaneous electrical, sunshade canopy, miscellaneous site work, site restoration, and all else specified and shown in the construction documents and not specifically addressed in separate bid items, including adjustments and work necessary for a complete fully functioning lift station.
AvailableGalveston County Municipal Utility District No. 57
Construction of sanitary and drainage facilities
Posted Date
Nov 25, 2025
Due Date
Dec 11, 2025
Release: Nov 25, 2025
Galveston County Municipal Utility District No. 57
Close: Dec 11, 2025
Construction of sanitary and drainage facilities
Galveston County Municipal Utility District No. 57
Provide construction of paving facilities.
Posted Date
Oct 30, 2025
Due Date
Nov 13, 2025
Release: Oct 30, 2025
Galveston County Municipal Utility District No. 57
Close: Nov 13, 2025
Provide construction of paving facilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Galveston County Municipal Utility District No. 57's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Galveston County Municipal Utility District No. 57's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database