Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
FPC Yankton
This requirement is for the acquisition of PTAC systems for the Durand building.
Posted Date
Jun 2, 2026
Due Date
Jun 8, 2026
Release: Jun 2, 2026
FPC Yankton
Close: Jun 8, 2026
This requirement is for the acquisition of PTAC systems for the Durand building.
FPC Yankton
Replace the roof. The Government requires engineered polymer shakes designed to replicate the aesthetic of hand-split shakes while providing enhanced durability and resistance to fire and impact. Dimensions: 9” Width x 22” Length; 5/8” thickness at the butt. Configuration: One-piece hip and ridge shakes optimized for pitches of 12:12 or less. Color/Finish: Aged Cedar aesthetic. Installation: Must be capable of being cut with a utility knife or circular saw and installed at a 9” or 10” exposure. Quantity: Sufficient material to cover approximately 6,600 square feet of hip and ridge roofing. See attached file.
Posted Date
May 27, 2026
Due Date
Jun 5, 2026
Release: May 27, 2026
FPC Yankton
Close: Jun 5, 2026
Replace the roof. The Government requires engineered polymer shakes designed to replicate the aesthetic of hand-split shakes while providing enhanced durability and resistance to fire and impact. Dimensions: 9” Width x 22” Length; 5/8” thickness at the butt. Configuration: One-piece hip and ridge shakes optimized for pitches of 12:12 or less. Color/Finish: Aged Cedar aesthetic. Installation: Must be capable of being cut with a utility knife or circular saw and installed at a 9” or 10” exposure. Quantity: Sufficient material to cover approximately 6,600 square feet of hip and ridge roofing. See attached file.
FPC Yankton
Provide above ground fuel tanks. Removal of an existing 2,500-gallon underground storage tank and the installation of a new 3,000-gallon above-ground split-compartment tank, including a new concrete pad, fuel island, and automated tracking system.
Posted Date
May 6, 2026
Due Date
May 21, 2026
Release: May 6, 2026
FPC Yankton
Close: May 21, 2026
Provide above ground fuel tanks. Removal of an existing 2,500-gallon underground storage tank and the installation of a new 3,000-gallon above-ground split-compartment tank, including a new concrete pad, fuel island, and automated tracking system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
FPC Yankton
FY26 P1 LOREN FISCHER TRASH PULL OCT 26
Effective Date
Sep 19, 2025
Expires
Effective: Sep 19, 2025
FPC Yankton
Expires:
FY26 P1 LOREN FISCHER TRASH PULL OCT 26
AvailableFPC Yankton
FY25 F4 JEFFERSON LINES - INMATE BUS TICKETS
Effective Date
Nov 14, 2024
Expires
Effective: Nov 14, 2024
FPC Yankton
Expires:
FY25 F4 JEFFERSON LINES - INMATE BUS TICKETS
FPC Yankton
FY25 B1 AVERA SACRED HEART LAB SERVICES OCT -SEP
Effective Date
Nov 14, 2024
Expires
Effective: Nov 14, 2024
FPC Yankton
Expires:
FY25 B1 AVERA SACRED HEART LAB SERVICES OCT -SEP
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge