Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Fox River Water Reclamation District
The Project consists of: Removal, Disposal, and Replacement of clarifier equipment in three rectangular primary clarifiers, including but not limited to chains, flights, guides, drives, motors, weirs, scum troughs, handrails, and outdoor lights. Investigation and lining, repair, or replacement of primary sludge draw off lines. Mass grading, retaining wall, soil stabilization. Removal, disposal, and replacement of manual scum troughs in two chlorine contact tanks. All associated site utility work, grading, paving, electrical, systems integration to provide fully functional wastewater treatment plant infrastructure.
Posted Date
Apr 15, 2026
Due Date
May 13, 2026
Release: Apr 15, 2026
Fox River Water Reclamation District
Close: May 13, 2026
The Project consists of: Removal, Disposal, and Replacement of clarifier equipment in three rectangular primary clarifiers, including but not limited to chains, flights, guides, drives, motors, weirs, scum troughs, handrails, and outdoor lights. Investigation and lining, repair, or replacement of primary sludge draw off lines. Mass grading, retaining wall, soil stabilization. Removal, disposal, and replacement of manual scum troughs in two chlorine contact tanks. All associated site utility work, grading, paving, electrical, systems integration to provide fully functional wastewater treatment plant infrastructure.
AvailableFox River Water Reclamation District
Provide chemical suppliers for a chemical supply contract for the bulk purchase of liquid sodium bisulfite for use in wastewater dechlorination.
Posted Date
Mar 27, 2026
Due Date
Apr 16, 2026
Release: Mar 27, 2026
Fox River Water Reclamation District
Close: Apr 16, 2026
Provide chemical suppliers for a chemical supply contract for the bulk purchase of liquid sodium bisulfite for use in wastewater dechlorination.
Fox River Water Reclamation District
Provide lawn and landscape maintenance service at its three Water Reclamation Facilities, five offsite properties, and Administration Building. Lawn and landscape maintenance care to properties (mowing, trimming, weed control and hand weeding) for a two-year contract period.
Posted Date
Mar 20, 2026
Due Date
Apr 10, 2026
Release: Mar 20, 2026
Fox River Water Reclamation District
Close: Apr 10, 2026
Provide lawn and landscape maintenance service at its three Water Reclamation Facilities, five offsite properties, and Administration Building. Lawn and landscape maintenance care to properties (mowing, trimming, weed control and hand weeding) for a two-year contract period.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Fox River Water Reclamation District
The Board received a presentation regarding the District's Facilities Master Plan goals and long-term capital improvement strategies. Key business actions included the approval of the FY 2027 board meeting schedule, the adoption of Resolution 552 regarding investment and banking matters, and Resolution 553 concerning the disposal of district property. The Board also approved Phase 1 bids for building additions and renovations, Change Order No. 7 for the North WRF Influent Bar Screens, and various amendments to the North WRF Bar Screen Installation and North PC 5-7 Rehabilitation projects. Additionally, engineering design services for Building 45 sludge conditioning improvements were approved, and the Executive Director provided a report on rate adjustments and potential grant funding for the ADP Solar Project.
The meeting included an executive session concerning the appointment, employment, compensation, discipline, performance, or dismissal of specific district employees. The consent agenda approved connection permits, payment of bills across multiple funds totaling over $4.7 million, and preapproval of IEPA permit applications for the Vista Gardens Townhome Project and the U-46 School District Larkin High School new stadium. New business involved the approval of a proposal for accounting services from Governmental Accounting, Inc., and approvals for several amendments and change orders related to facility projects, specifically the ADP WRF Bar Screen Installation Project, a clarifier mechanism addition, and the ADP Building 19 heat exchanger replacement project. The board also discussed and approved the annual performance evaluation and compensation review for the Executive Director. Reports were provided on ongoing projects, including updates on the facility master plan, biosolids master plan evaluation, North Electrical Improvements Project, and RAS/WAS Pump Station Project. The Executive Director reported on building expansion progress and confirmed that the West Plant solar field is fully energized and has received a certificate of completion, with subsequent steps involving rebate and tax credit submissions.
The meeting included discussion and approval of the tax levy for the fiscal year beginning May 1, 2025, through April 30, 2026, Change Order No. 3 for roof replacement at West WRF Sludge Pumping Station, professional service agreement for TYLin for ventilation safety compliance, employee year end bonus, and insurance proposal for Fox River Water Reclamation District. The District Engineer provided an update on ongoing projects, including the Facility Master Plan and the solar project at West Plant. The Executive Director reported on operational updates, including staffing adjustments and participation in a pilot training program.
The Board reviewed connection permits, contracts, and purchase orders. Discussions included a motion to approve the 2022 Holiday schedule, a personal leave policy change, the 2021 employee year-end bonus, and the 2022 property tax levy ordinance. Renewals for worker's compensation insurance and the annual subscription of the Oracle ERP/EPM Cloud System were approved. The board also discussed and approved a 1-year Oracle support agreement, a proposal for conversion to Traverse accounting software, and a vehicle replacement purchase. Additionally, the board approved the destruction of audio tapes of executive sessions, a recapture agreement, corrected pretreatment discharge permits, and an amendment to the Pump Station 31 improvements engineering services agreement. The meeting also covered a name change in financial policy and included technical services and executive director's reports.
The Board of Trustees held a meeting that included the election of officers for FY 2024, the appointment of trustees for the Board of Local Improvements, and the appointment of an Assistant Clerk. The board discussed and voted on reappointing Airdo Werwas, LLC as Attorney, with concerns raised about the contract language and billing practices. Cash disbursements were approved, and the board reviewed connection permits and purchase orders. A public hearing was held for the FY 2024 budget, which was subsequently approved. The board also approved the North Influent Screening Project, an agreement for construction engineering services, structural repair designs, a change order for a rehabilitation project, and a purchase order for sludge telescoping valves. Additionally, a salary increase, a rate study services proposal, and insurance coverages were approved. A resolution establishing a Decennial Committee on Local Government Efficiency was also approved, along with appointments to the committee. Technical Services reported on PFAS regulations and ongoing projects, while the Executive Director provided updates on accounting transitions, the upcoming 100th-anniversary open house, and legislative matters. The board also discussed the City of Elgin's plan to add Phosphorus to their water system and adjourned to an executive session before reconvening and adjourning the meeting.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Fox River Water Reclamation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database