Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Finger Lakes Developmental Disabilities Service Office (DDSO)
Work consist of Demolish the existing bathroom including removing the ceiling, wallboard, and subfloor taking care to protect safety equipment including the sprinkler system and fire alarm/strobe; install the floor drains and necessary plumbing rough in; once the plumbing rough in is approved, install the subfloor according to the design. It should generally pitch to the drains. Install the bathroom according to the design making sure to update the project manager with any pertinent information relating to the job including unforeseen circumstances and changes to the design.
Posted Date
May 4, 2026
Due Date
May 28, 2026
Release: May 4, 2026
Finger Lakes Developmental Disabilities Service Office (DDSO)
Close: May 28, 2026
Work consist of Demolish the existing bathroom including removing the ceiling, wallboard, and subfloor taking care to protect safety equipment including the sprinkler system and fire alarm/strobe; install the floor drains and necessary plumbing rough in; once the plumbing rough in is approved, install the subfloor according to the design. It should generally pitch to the drains. Install the bathroom according to the design making sure to update the project manager with any pertinent information relating to the job including unforeseen circumstances and changes to the design.
AvailableFinger Lakes Developmental Disabilities Service Office (DDSO)
Work consist of full renovation of the kitchen area.
Posted Date
May 4, 2026
Due Date
May 28, 2026
Release: May 4, 2026
Finger Lakes Developmental Disabilities Service Office (DDSO)
Close: May 28, 2026
Work consist of full renovation of the kitchen area.
AvailableFinger Lakes Developmental Disabilities Service Office (DDSO)
Remodeling of kitchen design work includes remove and dispose of all existing kitchen cabinets, countertops, sink, backsplash, etc; remove existing refrigerator, electric ranges, microwave and dishwasher for replacement, existing not savageable; remove existing cieling supply diffusers. Replace with new; remove existing flooring and underlayment down to subfloor; remove existing light fixtures. Provide and install led units similar to existing; repair or replace the walls as required to a smooth condition to accept paint and new cabinets; remove and replace all switches, receptacles and cover plates. Provide and install tamper-resistant gfci receptacles for all kitchen receptacles. For each kitchen circuit supplying the receptacles, provide and install a listed combination-type arc-fault circuit interrupter at the panelboard to provide protection of the entire branch circuit; provide and install appropriate backsplash on walls from back of the counter up to under the new cabinets.
Posted Date
May 4, 2026
Due Date
May 28, 2026
Release: May 4, 2026
Finger Lakes Developmental Disabilities Service Office (DDSO)
Close: May 28, 2026
Remodeling of kitchen design work includes remove and dispose of all existing kitchen cabinets, countertops, sink, backsplash, etc; remove existing refrigerator, electric ranges, microwave and dishwasher for replacement, existing not savageable; remove existing cieling supply diffusers. Replace with new; remove existing flooring and underlayment down to subfloor; remove existing light fixtures. Provide and install led units similar to existing; repair or replace the walls as required to a smooth condition to accept paint and new cabinets; remove and replace all switches, receptacles and cover plates. Provide and install tamper-resistant gfci receptacles for all kitchen receptacles. For each kitchen circuit supplying the receptacles, provide and install a listed combination-type arc-fault circuit interrupter at the panelboard to provide protection of the entire branch circuit; provide and install appropriate backsplash on walls from back of the counter up to under the new cabinets.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database