Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Fenske Road Municipal Utility District
Construction of the water plant to include 6" dia. 100 GPM well with 15 horsepower submersible motor, two 43,841 gallon bolted steel ground storage tanks, three 25 horsepower 400 GPM end suction centrifugal booster pumps, one 5,073 gallon ASME code hydropneumatic tank, sodium hypochlorite equipment, expected liquid phosphate equipment, a 150 kW diesel generator, concrete foundations, CMUoperations building, site grading, site paving, yard piping, electrical, wood fencing, and all else as shown on the construction
Posted Date
-
Due Date
Jun 4, 2026
Release: -
Fenske Road Municipal Utility District
Close: Jun 4, 2026
Construction of the water plant to include 6" dia. 100 GPM well with 15 horsepower submersible motor, two 43,841 gallon bolted steel ground storage tanks, three 25 horsepower 400 GPM end suction centrifugal booster pumps, one 5,073 gallon ASME code hydropneumatic tank, sodium hypochlorite equipment, expected liquid phosphate equipment, a 150 kW diesel generator, concrete foundations, CMUoperations building, site grading, site paving, yard piping, electrical, wood fencing, and all else as shown on the construction
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge