Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Family and Children's Aid, Inc. (FCA)
Work includes disassembling and removing existing handicap ramp leaving footings in place; rebuilding ramp to ADA standards with a 1:12 slope and 48" clear width and 60" landings, duplicate existing ramp; use pressure treated lumber and stainless steel fasteners on the frame of the ramp 4x4 posts, 2x8 joists; utilize 5/4x6 composite deck boards for the surface of the ramp and the surfaces of all railing structures with stainless steel fasteners; ensure stability with bracing of all railings; provide all new iron hand rails.
Posted Date
May 15, 2026
Due Date
Jun 12, 2026
Release: May 15, 2026
Family and Children's Aid, Inc. (FCA)
Close: Jun 12, 2026
Work includes disassembling and removing existing handicap ramp leaving footings in place; rebuilding ramp to ADA standards with a 1:12 slope and 48" clear width and 60" landings, duplicate existing ramp; use pressure treated lumber and stainless steel fasteners on the frame of the ramp 4x4 posts, 2x8 joists; utilize 5/4x6 composite deck boards for the surface of the ramp and the surfaces of all railing structures with stainless steel fasteners; ensure stability with bracing of all railings; provide all new iron hand rails.
AvailableFamily and Children's Aid, Inc. (FCA)
Project consists of renovation will include the reconfiguration of office space to create 6 new clinical offices, 2 ADA-compliant bathrooms, 2 AC unit acquisitions and installations, expansion of the facility entrance, and construction of an elevator tower and enclosure. See attached file.
Posted Date
May 31, 2025
Due Date
Jul 11, 2025
Release: May 31, 2025
Family and Children's Aid, Inc. (FCA)
Close: Jul 11, 2025
Project consists of renovation will include the reconfiguration of office space to create 6 new clinical offices, 2 ADA-compliant bathrooms, 2 AC unit acquisitions and installations, expansion of the facility entrance, and construction of an elevator tower and enclosure. See attached file.
Family and Children's Aid, Inc. (FCA)
Project consists of reconfiguration of office space to create 6 new clinical offices, 2 ADA-compliant bathrooms, 2 AC unit acquisitions and installations, expansion of the facility entrance, and construction of an elevator tower and enclosure.
Posted Date
-
Due Date
Jul 11, 2025
Release: -
Family and Children's Aid, Inc. (FCA)
Close: Jul 11, 2025
Project consists of reconfiguration of office space to create 6 new clinical offices, 2 ADA-compliant bathrooms, 2 AC unit acquisitions and installations, expansion of the facility entrance, and construction of an elevator tower and enclosure.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge