Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
False River Air Park Commission
Project consists of installation of a Jet A fuel system and associated equipment.
Posted Date
May 21, 2026
Due Date
Jun 23, 2026
Release: May 21, 2026
False River Air Park Commission
Close: Jun 23, 2026
Project consists of installation of a Jet A fuel system and associated equipment.
AvailableFalse River Air Park Commission
Project consists of the removal and replacement of existing navigational aids (navaids) and the weather observation system, including the omnidirectional approach lighting system (odals), runway end identifier lights (reils), and automated weather observing system (awos). All existing odals, reils, and awos equipment will be removed and replaced with new equipment. The installation will utilize the existing conduit infrastructure, but all associated wiring will be replaced. The new lighting systems will consist of led components. Minor modifications at the airfield lighting vault will be required. See attached file.
Posted Date
Jun 11, 2025
Due Date
Jun 30, 2025
Release: Jun 11, 2025
False River Air Park Commission
Close: Jun 30, 2025
Project consists of the removal and replacement of existing navigational aids (navaids) and the weather observation system, including the omnidirectional approach lighting system (odals), runway end identifier lights (reils), and automated weather observing system (awos). All existing odals, reils, and awos equipment will be removed and replaced with new equipment. The installation will utilize the existing conduit infrastructure, but all associated wiring will be replaced. The new lighting systems will consist of led components. Minor modifications at the airfield lighting vault will be required. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge