Winsome Wells Equipping RFP
Posted
Nov 4, 2026
Dec 9, 2026
Work to be performed generally includes all labor, materials, and equipment necessary to equip two Denver Basin production wells, Well A-3 (Arapahoe) and Well D-3 (Denver). The Work includes setting submersible pumps, motors, and drop pipe; installing pitless adapters, variable frequency drives, step-up transformers and electrical gear; and installing process piping, valves, and meters within the valve and meter vault, with yard piping to the Bar X transmission line. The Work also includes a creek augmentation station, concrete equipment pads and conduit stub-outs for a future generator, startup and performance testing, and disinfection of the wells, pumping equipment, and piping until passing bacteriological results are obtained. Site work includes grading, erosion control, cleanup, final regrading, and restoration of all disturbed areas.