Route 250 Water Line Upgrades RFP
Aug 19, 2026
Closes
Sep 29, 2026
Work includes approx 1,400 LF 12" ductile iron water main with new 12" C900 PVC water line, including approx. 70 LF of restrained-joint C900 Certa-Lok pipe within an existing casing. Work also includes replacement and installation of gate valves, connections to existing water mains and services, temporary water service, utility potholing, surface restoration, traffic control, erosion and sediment control, and other associated appurtenances and incidental work necessary for a complete installation.