B21005 – ‘G’ Street – 10th St. to 23rd St. (2024 GO BOND) RFP
Posted
Nov 6, 2026
Nov 24, 2026
Project includes pavement milling and overlay to extend the roadway's useful life. Improvements also include ada upgrades to existing curb ramps, driveways, and traffic signals, as well as an ada curb ramp upgrade. 2,315 SF temporary signs; 2 EA portable changeable message signs; 31 EA temporary barricades, type iii; 376 LF temporary type cl chain link fence; 1 LS erosion control; 3 ea removal of manholes; 60 LF removal of pipes; 1,633 CY general excavation. See attached file.



