Essex Special Road District CR 732 Bridge RFP
Aug 6, 2026
Closes
Aug 14, 2026
Work includes remove existing metal top; clean debris from angle on the sides; place new galvanized high rib R loc metal back; install new steel side runners (on top of the existing angle); pour a concrete top/deck 8" thick with 2- mats of #5 gr 60 (5/8) rebar on 12" centers each way.