Rooms to Go - Leander RFP
Posted
-
Dec 10, 2026
Project consists of the ground-up construction of rooms to go showroom with development of a 4.04 AC site. Trades included but not limited to surveying, concrete, masonry (CMU, stone), structural steel, metal fabrications, finish carpentry, millwork, waterproofing, insulation, EIFS, ACM, roofing, joint sealants, doors, storefront, drywall, tiling, act, flooring, wallcoverings, painting, sealed concrete, restroom accessories, canopy, fire sprinklers, plumbing, HVAC, electrical, fire alarms, earthwork, rigid paving, striping, landscaping, utilities.
